Browse
Search
Agenda 05-07-24; 7-a - Discussion on Statutes and Policies Regarding Project-Based School Capital Funding
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 7-a - Discussion on Statutes and Policies Regarding Project-Based School Capital Funding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:49:32 PM
Creation date
5/2/2024 1:38:48 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 05-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br /> Appendix 6. School Construction Project Components <br /> • Purchase and contracted pricing of property <br /> • <br /> Site Acquisition—Tasks and Survey <br /> costs associated with acquiring Deed recording <br /> a site Appraisals <br /> • Soils, environmental, suitability testing <br /> • Legal fees associated with purchase and recording <br /> • Pre-grading <br /> • Grading to include playing fields and playgrounds <br /> Hard Construction —Site & Installation of storm water run-off drainage <br /> Vertical Tasks and costs of Soil suitability testing (rock) <br /> "horizontal" and "vertical" Utility extension/installation <br /> construction: all construction 0 Sidewalks <br /> activities for the actual site * Turn lanes <br /> and building 9 Building Structure and Systems (includes General <br /> Contractor and all Sub-Contractors <br /> • Municipal Requirements <br /> • Landscaping <br /> Hard Construction—Off- <br /> Site 0 Off-site Traffic Improvements <br /> Tasks and costs of 0 Water and Sewer Service to the Site <br /> "horizontal" construction: all 9 Off-Site Environmental Mitigation <br /> construction activities for the 9 Trails and Greenway System <br /> surrounding area, not 0 Related Design <br /> including the building and <br /> direct site <br /> 0 Prime Construction Contracts (includes general <br /> Construction Costs— contractor, electrical contractor, HVAC contractor, <br /> Costs of constructing a new plumbing contractor) <br /> facility or renovating an * Other construction related work <br /> existing one 9 Sprinkler <br /> 9 Expanded Water Flows <br />
The URL can be used to link to this page
Your browser does not support the video tag.