Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 1:36:17 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 05-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
90 <br /> US 70 Multimodal Corridor Study <br /> o B.4.1: Develop protected bicycle route on Lebanon Road from Doe Run Road to Old Paths Trail. <br /> o B.4.2: Develop protected bicycle route along Richmond Road from Lebanon Road to Efland-Cheeks Park <br /> and Community Center; connect the route south across US 70 to shared-use path proposed to run parallel <br /> to 140. <br /> o C.4.1:Add sharrows and signage to establish bike route along the length of Faucette Mill Road north of <br /> the Hillsboro Town border. <br /> o C.4.2: Construct an off-road bicycle path that connects Faucette Mill Road with Lebanon Road across the <br /> Eno River. <br /> • Improve the accessibility of existing bus stops (Objective A.3/B.6/C6/D.5/F.3). <br /> o A.3.1/B.6.1/C.6.1/D.6.1/F.4.1: Update all existing bus stops to accessibility and safety standards, complete <br /> with shelters, seating, lighting, visible and audible information, and appropriate pedestrian and ADA <br /> connectivity. <br /> • Construct accessible bus shelters that serve Mebane's employment centers (Objective A.4). <br /> o A.4.1: Add two accessible, safe bus shelters with appropriate pedestrian connectivity that serve businesses <br /> on Oakwood Street and Industrial Drive. <br /> • Construct accessible bus shelters that serve Mebane's recreation destinations (Objective A.5). <br /> o A.5.1: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian connectivity that <br /> serves Mebane Community Park. <br /> o A.5.2: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian connectivity that <br /> serves Mebane Memorial Garden. <br /> • Construct accessible bus shelters that service Mebane's residential communities (Objective A.6). <br /> o A.6.1: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian connectivity that <br /> serves the Supper Club mobile home community. <br /> o A.6.2: Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US 70 from the <br /> existing Ashbury Blvd. stop. <br /> • Accommodate all transportation modes in roadway improvement projects (Objective A.7/B.8/C.9/D.8/E.2/F.7). <br /> o A.7.1: Construct a minimum 5-foot sidewalk on north side of US 70 from 9th Street to Ashbury Blvd. <br /> o A.7.2: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south side of US <br /> 70 from McBane Store Road to Buckhorn Road to accompany the long-term typical section widening; <br /> install bicycle pattern rumble strips in the short-term. <br /> o B.8.1: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south side of US <br /> 70 from Buckhorn Road to Lloyds Dairy Road to accompany the long-term typical section widening; install <br /> bicycle pattern rumble strips in the short-term. <br /> o B.8.2 Install high visibility signs along US 70 indicating presence of cyclists between Tinnin Road and <br /> Gaines Chapel Road. <br /> o B.8.3: Revise the US 70/Buckhorn Road realignment to include a 5-foot paved shoulder with bicycle <br /> pattern rumble strips. <br /> o C.9.1: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south side of US <br /> 70 from Lloyd's Dairy Road to NC 86. <br /> 81 Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.