Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 1:36:17 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 05-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
85 <br /> US 70 Multimodal Corridor Study <br /> • Improve bicycle connectivity between residential and commercial centers in Hillsborough (Objective <br /> C.16/D.14/F.72). <br /> o C.16.1: Add sharrows and signage to establish bike route on Torain Street between Faucette Mill Road and <br /> Rainey Avenue. <br /> o C.16.2: Add sharrows and signage to establish east-west bike route through Fairview Park from Rainey <br /> Avenue to NC 86. <br /> o C.16.3: Add sharrows and signage to establish a bicycle route on Hayes and Union Streets from West King <br /> Street to Cameron Street. <br /> o C.16.4: Add sharrows and signage to establish a bicycle route on Churton Street between Union Street <br /> and Margaret Lane. <br /> o D.14.1:Add sharrows and signage to establish a bicycle route on the length of Crawford Road. <br /> o F.12.1: Add sharrows and signage to establish a bicycle route on the length of Meadowlands Drive. <br /> • Connect Eno River State Park to US via bicycle infrastructure (Objective D.751E.7). <br /> o D.15.1:Add sharrows and signage to establish bike route on Lawrence Road from US 70 to Palmers Grove <br /> Church Road. <br /> o E.7.1: Construct protected bike lane on Pleasant Green Road from US 70 to Cole Mill Road. <br /> o E.7.2: Add sharrows and signage to establish bike route on Cole Mill Road from Pleasant Green Road to <br /> the Eno River State Park entrance. <br /> 5.1.1.3 Goal 3: Improve transit accessibility. <br /> To achieve Goal 3, improvement projects should: <br /> • Improve bus service reliability (Objective A.2/B.5/C.5/D.4/F.3). <br /> o A.2.1/B.5.1/C.5.1: Increase the frequency and service hours of GoTriangle's ODX route. <br /> o A.2.2/B.5.2/C.5.2/D.4.1/F.3.1: Increase the frequency and service hours of Orange County's Orange- <br /> Alamance Connector and Hillsborough Circulator routes. <br /> o A.2.3: Increase the frequency and service hours of PART's Route 4. <br /> • Improve the accessibility of existing bus stops (Objective A.3/B.6/C6/D.5/F.3). <br /> o A.3.1/B.6.1/C.6.1/D.6.1/F.4.1: Update all existing bus stops to accessibility and safety standards, complete <br /> with shelters, seating, lighting, visible and audible information, and appropriate pedestrian and ADA <br /> connectivity. <br /> • Construct accessible bus shelters that serve Mebane's employment centers (Objective A.4). <br /> o A.4.1: Add two accessible, safe bus shelters with appropriate pedestrian connectivity that serve businesses <br /> on Oakwood Street and Industrial Drive. <br /> • Construct accessible bus shelters that serve Mebane's recreation destinations (Objective A.5). <br /> o A.5.1: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian connectivity that <br /> serves Mebane Community Park. <br /> o A.5.2: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian connectivity that <br /> serves Mebane Memorial Garden. <br /> 76 Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.