Orange County NC Website
84 <br /> US 70 Multimodal Corridor Study <br /> o D.8.1: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south side of US <br /> 70 from NC 86 to Palmers Grove Church Road. <br /> o E.2.1: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south side of US <br /> 70 from Palmers Grove Church Road to NC 751; in the short term,widen shoulders to accommodate <br /> minimum 5-foot paved shoulder with bicycle pattern rumble strips. <br /> o F.7.1: Construct 5-foot sidewalks on the north and south sides of US 70 Business from NC 86 to Palmer <br /> Grove Church Road. <br /> o F.7.2:Widen the shoulders on US 70 Business from NC 86 to Palmer Grove Church Road to provide a <br /> minimum 5-foot paved shoulder with bicycle pattern rumble strips. <br /> • Extend sidewalk connectivity to anticipated growth areas (Objective A.9/B.71/C.11/D.10/E.4/F.9) <br /> o A.9.1/B.11.1/C.11.1/D.10.1/E.4.1/F.9.1: Establish a maintenance agreement between NCDOT and Orange <br /> County for new and existing pedestrian facilities on US 70. <br /> o A.9.2/B.11.2/C.11.2/D.10.1/E.4.1/F.9.1: Require developers building on land parcels fronting US 70 to either <br /> construct sidewalk along their frontages, dedicate ROW for future construction, or pay in lieu. <br /> • Complete the sidewalk contiguity in downtown Mebane (Objective A.72). <br /> o A.12.1: Maintain existing sidewalk on US 70's north side between Mebane Community Park and 91" Street. <br /> o A.12.2: Combine and minimize curb cuts and wide, flush frontages as parcels redevelop. <br /> • Manage travel demand for future development in the Efland-Buckhorn-Mebane economic development area <br /> (Objective B.3). <br /> o B.3.1: Implement and regularly update the Efland-Buckhorn-Mebane Access Management Plan (updated <br /> 2019). <br /> o B.3.2: Update the Efland-Buckhorn-Mebane Access Management Plan to include more expansive <br /> pedestrian, bicycle, and transit connectivity recommendations. <br /> • Improve the permeability of US 70 as a barrier within Hillsborough (Objective C.14/D.72). <br /> o C.14.1: Construct shared-use path along the east side of NC 86 from US 70 to Corbin Street. <br /> o C.14.2: Modernize the US 70/Faucette Mill Road intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading pedestrian intervals, no right turn on red restrictions, and high- <br /> visibility markings. <br /> o C.14.3: Modernize the US 70/NC 86 intersection with pedestrian refuge islands, accessible pedestrian <br /> signal heads/pedestals on all corners, leading pedestrian intervals, no right turn on red restrictions, and <br /> high-visibility markings. <br /> o D.12.1: Construct sidewalk and protected bicycle route on the entirety of Orange High School Road; <br /> connect to Caine Street across US 70 along parcel lines. <br /> o D.12.2: Modernize the US 70/Orange High School Road intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading pedestrian intervals, no right turn on red restrictions, and high- <br /> visibility markings. <br /> o D.12.3: Modernize the US 70/Lawrence Road intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading pedestrian intervals, no right turn on red restrictions, and high- <br /> visibility markings. <br /> 75 Recommendations <br />