Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 1:36:17 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 05-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> US 70 Multimodal Corridor Study <br /> Table24 Segment D Objectives.........................................................................................................................93 <br /> Table25 Segment E Objectives........................................................................................................................93 <br /> Table26 Segment F Objectives........................................................................................................................94 <br /> Table 27 Opinion of Probable Cost by Segment.......................................................................................125 <br /> Table 28 NCDOT Complete Streets Policy (2019) Cost Share Scenarios........................................127 <br /> Table 29 Complete Streets Betterment Cost Share.................................................................................127 <br /> List of Figures <br /> Figure No. Description Page <br /> Figure 1 US 70 Study Corridor, Segmented.....................................................................................................3 <br /> Figure 2 Snapshot from the Round 1 Interactive Public Input Map....................................................10 <br /> Figure 3 Snapshot from the Round 2 Interactive Public Input Map....................................................11 <br /> Figure 4 Protected Areas and Open Space....................................................................................................16 <br /> Figure 5 Wildlife Resources in Corridor...........................................................................................................18 <br /> Figure 6 Major Wildlife Corridors &Critical US 70 Crossing Areas......................................................20 <br /> Figure7 Places of Interest....................................................................................................................................23 <br /> Figure 8 Project Vicinity and Study Intersections........................................................................................30 <br /> Figure 9 Historic Traffic Volume Trends by Study Segment...................................................................32 <br /> Figure 10 2019 Seed Data and Statutory Limits.............................................................................................35 <br /> Figure 11 2019 StreetLight Total Truck Percentages....................................................................................37 <br /> Figure 12 Level of Service Illustration.................................................................................................................38 <br /> Figure 13 Corridor Level of Service Summary for US 70.............................................................................39 <br /> Figure 14 Worst Case Intersection Level of Service Summary for US 70.............................................40 <br /> Figure 15 2020-2029 NCDOT STIP Projects in Corridor..............................................................................44 <br /> Figure 16 Bicycle and Pedestrian Accommodations...................................................................................51 <br /> Figure 17 Transit Route in Corridor.....................................................................................................................58 <br /> Figure18 GoTriangle Route Map.........................................................................................................................59 <br /> Figure 19 Run-Off Road Crash Severity & Passing Zones..........................................................................66 <br /> Figure 20 US 70 Recommended Roadway Infrastructure Improvements............................................95 <br /> Figure 21 US 70 Recommended Traffic Operational Improvements.....................................................98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.