Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 1:36:17 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 05-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br /> US 70 Multimodal Corridor Study <br /> 2.5 Interactive Map <br /> For each round of community workshops, the project team welcomed corridor comments through an <br /> interactive map. The interactive map was prominently featured on the project website and promoted through <br /> the workshops and Study Team communications to the public. During the first round of workshops, residents, <br /> commuters, and other users of corridor were encouraged to contribute to the Study Team's understanding of <br /> the corridor by placing "markers"' on assets, issues, opportunities, and quick fixes on locations of interest. This <br /> map was open for comment for 8 weeks. <br /> Figure 2 below displays the distribution of the 55 interactive submissions by comment category.A plurality of <br /> submissions was vehicle-related current issues that addressed safety, visibility, speed, passing, and other <br /> operational problems. <br /> Figure 2 Snapshot from the Round 1 Interactive Public Input Map <br /> The second round of community outreach included an interactive map that provided the draft <br /> recommendations for public input. Users of the site were able to add comments on each recommendation, <br /> identified by mode of travel, and/or"like" a recommendation to show agreeance. This map was open for <br /> comment for 6 weeks. Figure 3 below displays points of recommendations, coded by segment and <br /> recommendation type. Four comments were offered and 14 "likes"were given to various recommendations. <br /> 2.6 Survey <br /> The project team also offered a survey to garner feedback on policy recommendations that applied to the <br /> corridor as a whole. The survey was 15 questions and took about 10 minutes to complete. A total of 5 <br /> responses were received.The survey was shared on the project website and by the corridor communities. It <br /> was open online for 6 weeks. <br /> Overall, public sentiment regarding the project was positive. Most individuals liked the recommendations <br /> presented and acknowledged the need for improved connectivity and access for multimodal users. <br /> 10 The Plan Making Process <br />
The URL can be used to link to this page
Your browser does not support the video tag.