Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 1:36:17 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 05-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br /> US 70 Multimodal Corridor Study <br /> Segment F <br /> Segment F extends from east of the NC 86/Churton Street intersection to the US 70 Business intersection at <br /> Palmers Grove Church Road. <br /> Like Segment E, this stretch is part of the NC Colonial Heritage Byway. Land use along this segment includes <br /> light industrial, institutional, commercial, residential, and recreational. This section contains several local <br /> employment centers (about a dozen enterprises), many of which are distribution operations, and is home to a <br /> destination recreation facility - Sportsplex -and the Passmore Senior Center. Historical structure pose <br /> development constraints. <br /> This facility is functionally classified as Other Principal Arterial west of NC 8 and as Major Collector to the east. <br /> The latest DCHC MPO CTP identifies this segment as needing bicycle improvements west of Lawrence Road <br /> and enhanced bus service west of NC 86. <br /> Key segment attributes: <br /> • The prevailing roadway cross-section is two lanes with minimal paved shoulders (e.g., less <br /> than 2'). <br /> • There are limited sidewalks on the south side of US 70 Business, extending east from NC <br /> 86 to the Sportsplex. <br /> • There are no bicycle facilities. <br /> • The speed limit is 40 mph throughout. <br /> • Estimated 2022 AADTs range from approximately 9,000 vpd on the west end, down to <br /> approximately 3,000 on the east. <br /> 6 Study Context <br />
The URL can be used to link to this page
Your browser does not support the video tag.