Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 1:36:17 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 05-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
142 <br /> US 70 Multimodal Corridor Study <br /> A.9.1: Establish a maintenance agreement <br /> Local, Mobility, <br /> between NCDOT and Orange County for new NCDOT SafetyPed <br /> and existing pedestrian facilities on US 70. <br /> A.9.2: Require developers building on land <br /> parcels fronting US 70 to either construct Local Mobility, Ped <br /> sidewalk along their frontages, dedicate ROW Safety <br /> for future construction, or pay in lieu. <br /> ■ <br /> A.10.1: Modernize the US 70/3rd Street <br /> intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading RAISE, SS4A Placemaking,Safety Intersection <br /> pedestrian intervals, no right turn on red <br /> restrictions, and high-visibility markings. <br /> A.10.2: Modernize the US 70/4t" Street <br /> intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading RAISE, SS4A Placemaking,Safety Intersection <br /> A.10 Modernize pedestrian intervals, no right turn on red <br /> existing US 70 restrictions, and high-visibility markings. <br /> pedestrian crossing A.10.3: Modernize the US 70/5t" Street <br /> in downtown <br /> intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading <br /> pedestrian intervals, no right turn on red <br /> restrictions, and high-visibility markings. <br /> Coordinate with NCDOT and NCRR to refine Placemaking, <br /> design of T-550GC as shown in Mebane's 5`" RAISE, SS4A Safety Intersection <br /> Street Improvement Traffic Impact Study <br /> (August 2022) to maintain three-lane <br /> northbound approach and crosswalk/sidewalk <br /> design on the east side, and replicate that <br /> design on the west side. <br /> 133 Implementation and Funding <br />
The URL can be used to link to this page
Your browser does not support the video tag.