Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 1:36:17 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 05-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
102 <br /> US 70 Multimodal Corridor Study <br /> C.14: Improve the permeability of US 70 as a barrier within Hillsborough. <br /> CA 5: Expand transit by partnerships with service providers in Orange County. <br /> C.16: Improve bicycle connectivity between residential and commercial centers in Hillsborough. <br /> C.17: Expand regional transit services to residential centers in the corridor. <br /> C.18: Ensure long term protection of local watersheds. <br /> Table 24 Segment D Objectives <br /> D.1: Reduce automobile congestion delay times in response to projected traffic demand growth through the <br /> corridor. <br /> D.2: Introduce and expand park and ride services. <br /> D.3: Manage travel demand resulting from trips to and from schools. <br /> D.4: Improve bus service reliability. <br /> D.5: Improve accessibility of existing bus stops. <br /> D.6: Construct accessible bus shelters that serve Hillsborough's employment centers. <br /> D.7: Construct accessible bus shelters that serve Hillsborough's residential communities. <br /> D.8:Accommodate all transportation modes in roadway improvement projects. <br /> D.9: Slow automobile traffic throughout the corridor. <br /> D.10: Extend sidewalk connectivity to anticipated growth areas. <br /> D.11: Establish gateways to Hillsborough. <br /> D.12: Improve the permeability of US 70 as a barrier within Hillsborough. <br /> D.13: Expand transit by partnerships with service providers in Orange County. <br /> D.14: Improve bicycle connectivity between residential and commercial centers in Hillsborough. <br /> D.15: Connect Eno River State Park to US 70 via bicycle infrastructure. <br /> D.16: Ensure long term protection of local watersheds. <br /> Table 24 Segment E Objectives <br /> E.1: Reduce automobile congestion delay times in response to projected traffic demand growth through the <br /> corridor. <br /> E.2:Accommodate all transportation modes in roadway improvement projects. <br /> E.3: Slow automobile traffic throughout the corridor. <br /> E.4: Extend sidewalk connectivity to anticipated growth areas. <br /> E.5 Prepare east Orange County for smart growth. <br /> E.6: Expand transit by partnerships with service providers in Orange County. <br /> E.7: Connect Eno River State Park to US 70 via bicycle infrastructure. <br /> 93 Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.