Browse
Search
5-1-24 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2024
>
5-1-24 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2024 7:51:28 PM
Creation date
4/25/2024 7:49:45 PM
Metadata
Fields
Template:
BOCC
Date
5/1/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
5_1_24 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erosion and Sedimentation Control: <br />According to current Orange County GIS imagery of the project parcel, there are no <br />mapped stream features or other water features within the project parcel boundaries. <br />Orange County enforces stream buffers along streams, rivers, water bodies, and other <br />water features (e.g. wetlands) as outlined in Section 6.13 of the Orange County UDO. <br />Based on the submitted materials for the proposed development, the project could meet <br />the basic Erosion and Sedimentation Control requirements as outlined in Section 6.15 of <br />the Orange County UDO and could be developed as generally proposed. <br />Stormwater Management: <br />The project parcel is located in the Upper Eno Protected (Neuse River Basin) Overlay <br />District and is therefore subject to compliance with the Neuse Nutrient Management <br />Strategy. There are no known Special Flood Hazard Areas (SFHAs) located on the <br />project parcel. Based on the submitted materials for the proposed development, the <br />project could meet the basic Stormwater Management requirements as outlined in <br />Section 6.14 of the Orange County UDO. While preliminary at this stage of Orange County <br />review, the proposal is under the threshold for stormwater review. <br />Conclusion: <br />The Division has No Objections to the approval of the rezoning request so long as a <br />complete LDP application and supporting plans and calculations are submitted to Orange <br />County for review and approval prior to commencement of on-site Land-Disturbing <br />Activity, if thresholds were to be reached or exceeded with any future plan changes. As <br />the project progresses, additional field observations, and/or permitting by others (e.g. US <br />Army Corps of Engineers, NC Department of Environmental Quality, NC Department of <br />Transportation, etc.), additional buffers, setbacks, and/or additional Orange County <br />review and permitting may apply beyond the proposed development as shown with this <br />rezoning request. <br /> <br /> <br />___________________________ _______________ <br /> Christopher Sandt, PE Date <br /> <br /> <br /> 4/8/2024 <br />___________________________ _______________ <br /> Steve Kaltenbach Date <br /> <br />75
The URL can be used to link to this page
Your browser does not support the video tag.