Orange County NC Website
Determining 2030 Comprehensive Plan Consistency <br />(To be completed for Zoning Atlas Amendments and Special Use Permits) <br /> <br /> <br /> <br />Applicable Adopted Plans <br />Is the project subject to the Hillsborough-Orange Central Orange Coordinated Area <br />(COCA) Land Use Plan? (Y/N) If Yes, include comments. Y/N <br />Comments: <br />Is the project subject to the Orange County-Chapel Hill-Carrboro Joint Planning Land <br />Use Plan? (Y/N) If Yes, include comments. Y/N <br />Comments: <br />Is the requested zoning district indicated for the Land Use Classification, as shown on <br />the chart in Appendix F of the 2030 Comprehensive Plan? If No, include comments. Y/N <br />Comments: <br />Does the proposed project fit with the written text of the Land Use Classification, as <br />found in Article 10 of the UDO, and Chapter 5 and Appendix F of the 2030 <br />Comprehensive Plan. If No, include comments. <br />Y/N <br />Comments: <br />Does the proposed project require a Future Land Use Map (FLUM) Amendment? If Yes, <br />include comments on the proposed Land Use Classification and any pertinent Land Use <br />Category Locational Criteria, Appendix G of the 2030 Comprehensive Plan. <br />Y/N <br />Comments: <br /> <br />Potable Water and Wastewater <br />Does the project require Public Utilities (i.e. Water and/or Sewer)? (Y/N) Y/N <br />Comments: <br />If Public Utilities are required, is the project located within a Primary Service Area as <br />identified on the Water and Sewer Management, Planning and Boundary Agreement <br />Map? (Y/N) If No, include comments. <br />Y/N <br /> <br />already existing <br />38