Browse
Search
5-1-24 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2024
>
5-1-24 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2024 7:51:28 PM
Creation date
4/25/2024 7:49:45 PM
Metadata
Fields
Template:
BOCC
Date
5/1/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
5_1_24 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) The OMP shall clearly indicate the steps that will be taken for restoring a <br />SCM to its design specifications if an SCM failure occurs. <br />(3) Landscaping and Grounds Maintenance <br />(a) Landscaping and grounds maintenance shall be the responsibility of the <br />owning entity. <br />(b) Vegetation shall not be established or allowed to mature to the extent <br />that the integrity or functionality of the SCM is diminished or threatened, <br />or to the extent of interfering with any easement or access to the SCM. <br />(4) SCM Repair or Reconstruction <br />(a) Except for general landscaping and grounds maintenance, the owning <br />entity shall notify Orange County prior to any repair or reconstruction of <br />the SCM. <br />(b) After notification by the owning entity, the Erosion Control Officer shall <br />inform the owning entity of any required additions, changes or <br />modifications and of the time period to complete said SCM <br />improvements. <br />(c) All SCM improvements shall be made consistent with the approved SMP, <br />the approved OMA, and the approved OMP. <br />(5) Annual SCM Inspection Required <br />(a) All SCMs shall be inspected by the owning entity at least on an annual <br />basis to determine whether the SCM is performing as designed and <br />intended. <br />(b) Records of inspections shall be submitted annually to the Erosion <br />Control Officer on forms approved by Orange County. <br />(c) Annual inspections shall begin within one year of the issuance of the <br />Certificate of Stormwater Compliance for the SCM. <br />(d) The Erosion Control Officer will inspect each SCM approved pursuant to <br />these rules approximately every five years. In the event the Erosion <br />Control Officer discovers the need for corrective action of improvements, <br />he/she shall notify the owning entity of the needed SCM improvements <br />and the date by which the corrective action is to be completed. All SCM <br />improvements shall be made consistent with the approved SMP and the <br />approved OMA. After notification by the owning entity, the Erosion <br />Control Officer shall inspect and approve the completed SCM <br />improvements. <br />(6) 5-Year SCM Maintenance Inspection Fee <br />(a) The 5-year SCM maintenance inspection fee for the first 5-year period <br />shall be paid before: <br />(i) The issuance of the Certificate of Stormwater Compliance for the <br />SCM. <br />(ii) The release of up to 75% of the value of the SCM Performance <br />Guarantee. <br />(b) The 5-year SCM maintenance inspection fee shall be based upon the <br />current Orange County Planning Fee Schedule, and shall be paid to <br />Orange County following each 5-year SCM inspection. <br />(c) Failure to pay the 5-year SCM maintenance inspection fee shall be <br />deemed a violation of this Ordinance. <br />130
The URL can be used to link to this page
Your browser does not support the video tag.