Orange County NC Website
26 county will oversee and manage the project. Nelson Nigari was chosen for the project to design a short- <br /> 27 term transit strategy. The short-range transit plan was completed back in 2018. Nelson Nigari knows <br /> 28 the regional transit agencies, so Orange County will use them to update our short-range transit plan. <br /> 29 This will assist with our plans for an agency for the next 5-10 years; hence the short-range part will be <br /> 30 used for new things. In the past we only updated the long-range transit plan, now this will be done <br /> 31 simultaneously with the short-range transit plan. There is a cap on the projects of 250K, but Orange <br /> 32 County will probably pay 234K depending on the contract once complete. The Transportation <br /> 33 Multimodal Plan consists of a single document and a single map that contains all our transportation <br /> 34 projects, policies, and programs, including our comprehensive strategy plans, metropolitan plans, and <br /> 35 street plans. Although it was previously examined and posted on our website, we wish to update it and <br /> 36 clarify that WSP was the consultant hired to put the materials together. There shouldn't be any requests <br /> 37 for comments and suggestions during the analysis process because these are previously adopted plans <br /> 38 and documents; instead, they will do one round of public workshops after their work is finished and this <br /> 39 document is written. Upon completion of the planning stage, we can execute the contract with WSP. <br /> 40 This will lay the groundwork for Orange County to choose new initiatives and determine how things will <br /> 41 move ahead using a prioritization strategy. The project's construction will start in October 2023. The <br /> 42 strategy will give more emphasis on how to select initiatives for the foreseeable future through the <br /> 43 prioritization process. Areas that are not integrated will be the emphasis. Since Orange County's <br /> 44 concentration is on the county's rural communities, we are not stating anything about Chapel Hill, <br /> 45 Carrboro, or Hillsborough amendments, plans, or projects. This will make it easier to decide on new <br /> 46 initiatives moving forward and to have everything in one document. We are replicating the Airedale <br /> 47 undertaking that was finished in 2022. Towns will therefore play a significant role in the planning <br /> 48 process. In this preliminary draft, everyone will be able to see all projects in a single document using <br /> 49 mapping software, and collectively we will be able to establish the priority processes for all projects <br /> 50 going forward. Question: What updates to the CTP and MTP are necessary, and how can we improve <br /> 51 project competition with the state's prioritization procedure? <br /> 52 <br /> 53 <br /> 54 Sidewalk Maintenance Agreement <br /> This process was started by NCDOT, and Orange <br /> County shortly thereafter followed. We are <br /> 1Pe,n Nid°°T A working with the town of Hillsborough because <br /> Sidewalkk Arno <br /> m they have agreed to install sidewalks on both <br /> "r' ,oaq sides of the bridge. You'll find a bridge on NC 86 <br /> close to NC10, near the SHEETS and Home Depot, <br /> Wu�wmanRd '�� going south of the SHEETS and Home Depot you <br /> will cross the railroad tracks over the road. There <br /> m� <br /> Waller Clark Dr— is potential to extend the walkway north of the <br /> � <br /> (SR2206) Home Depot and Arby's involving further <br /> conversations with NCDOT and staff project <br /> t> managers. Arby's will build a sidewalk, and Home <br /> 67 Depot currently has one. Additionally, because of the doughnut hole, DOT is willing to build sidewalks <br /> 68 on county-owned lots that are not under the jurisdiction of the town. Therefore, DOT will design, <br /> 69 engineer, and aid in maintaining sidewalks. The agreement in the packet therefore pertains to those 4 <br /> 70 small parcels for 4000 feet of sidewalk, the majority of which will be on NC 86's west side from the <br /> 71 bridge to the development and a small portion on its east side. The county will be responsible for <br /> 2 <br />