Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # Description LET/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />HO-0013 <br />51177.1.1 <br />51177.2.1 <br />51177.2.2 <br />51177.3.1 <br />Chapel Hill from Franklin Street and Rosemary Street, and <br />the streets in between from Merritt Mill Road to Henderson <br />Street in downtown Chapel Hill. Install new mast arm and <br />curb and sidewalk improvements. <br />6/4/2026 FY28 $2,100,000 Project approved by BOT and assigned.Stephen Robinson <br />BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road)9/17/2026 FY2029 $1,100,000 Planning and design activities underway <br />Plans at 65% <br />Vacant <br />BP7-R013 Replace Bridge #90 on SR 1940 (Damascus Church Road)9/16/2027 FY2030 $800,000 Planning and design activities underway <br />Plans at 25% <br />Vacant <br />EB-5998 Construct MUP on US 15/501 from Willow Drive to SR <br />1741/SR 1838 (Old Durham Chapel Hill Road) in Chapel Hill <br />9/30/2026 FY2028 $2,044,000 Municipal agreement needs to be <br />requested and executed to begin work. <br />Town of Chapel <br />Hill/Stephen Robinson <br />EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from SR <br />1772 (North Greensboro Street) to south of Norfolk <br />Southern Railroad Tracks in the Town of Carrboro <br />9/17/2026 FY2029 $848,000 Municipal agreement needs to be <br />requested and executed to begin work. <br />Town of <br />Carrboro/Stephen <br />Robinson <br />I-5958 <br />45910.1.1 <br />45910.3.1 <br />Pavement Rehabilitation on I-40/I-85 from West of SR 1114 <br />(Buckhorn Road) to West of SR 1006 (Orange Grove Road) <br />11/17/2026 FY2028 $8,690,000 Planning and design activities pending Chris Smitherman <br />BR-0247 Replace Bridge #29 on US 70 Business/NC 86 over Cates <br />Creek <br />11/16/2027 FY2029 Pending Preliminary activities pending Bryan Key <br />R-5821A <br />47093.1.2 <br />47093.2.2 <br />47093.3.2 <br />Construct operational improvements including <br />Bicycle/Pedestrian accommodations on NC 54 from SR <br />1006 (Orange Grove Road) to SR 1107 /SR 1937 (Old <br />Fayetteville Road). <br />6/17/2031 FY2033 $7,000,000 PE funding approved 10/10/17, design <br />activities currently suspended, <br />Coordinating with NC54 West Corridor <br />Study <br />Chris Smitherman <br />BP7-R007 Replace Bridge #63 on Pleasant Green Road 9/5/2030 FY2033 $2,500,000 Planning and design activities underway Vacant <br />Page 3 DCHCMPO Mar 2024
The URL can be used to link to this page
Your browser does not support the video tag.