Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # Description LET/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />SS-6207T <br />51112 <br />Portions of Twenty-One (21) Routes. Curve Warning Sign <br />Installation. <br />9/20/23 9/30/24 $200,000 Project approved by BOT and assigned. <br />Planning and design activities underway. <br />Dawn McPherson <br />C-5650 Construct sidewalk on one side of SR 1919 (Smith Level <br />Road/S. Greensboro St.) from Public Works Drive to the <br />northern end of Old Pittsboro Road in Carrboro <br />12/4/2025 FY2028 $1,718,000 Carrboro approved to incorporate water <br />line work into design. Env doc returned w <br />comments on 12/10/21. Document to be <br />updated to include additional limits for <br />resurfacing. NCDOT waiting on revised <br />plans to be submitted for review. Util <br />Plans under review. <br />Town of <br />Carrboro/Stephen <br />Robinson <br />HS-2007J Install a new crosswalk with Rapid Rectangular Flashing <br />Beacons (RRFB), raised center island, pedestrian signage, <br />and approximately 125 linear feet of sidewalk on NC 86 at <br />Critz Drive in Chapel Hill <br />11/21/2024 6/30/2025 $300,000 Planning and deisgn activities underway Chris Smitherman <br />B-6037 Replace Bridge #49 over Norfolk Southern Railway on NC <br />86 <br />7/15/2025 FY2029 $2,500,000 Planning and design activities underway Chris Smitherman <br />BR-0092 Replace Bridge #37 on NC 86 over New Hope Creek 8/19/2025 FY2028 $4,100,000 Planning and design activities underway Alexander Foster <br />EB-5880 Construct sidewalk on the north side of SR 1005 (Jones <br />Ferry Road) from Davie Road to SR 1010 (West Main St.) in <br />Carrboro <br />9/30/2027 FY2029 $441,000 Municipal agreement needs to be <br />requested and executed to begin work. <br />Town of <br />Carrboro/Stephen <br />Robinson <br />EB-5890 Construct sidewalk on Barnes Street from King Street to SR <br />1005 (Jones Ferry Road) in Carrboro <br />9/30/2027 FY2029 $230,000 Municipal agreement needs to be <br />requested and executed to begin work. <br />Town of <br />Carrboro/Stephen <br />Robinson <br />EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from <br />south of Norfolk Southern Railroad to NC 86 (MLK Jr. Blvd.) <br />in Chapel Hill <br />10/2/2025 FY2027 $3,104,000 Municipal agreement executed and <br />project development underway. <br />Town of Chapel <br />Hill/Stephen Robinson <br />I-3306AC I-40 at NC 86 - Upgrade to superstreet from Northwood <br />Drive to Ramp C/D at I-40 interchange <br />10/21/2025 FY2028 $4,350,000 Planning and design activities underway Radha Attaluri <br />Page 2 DCHCMPO Mar 2024
The URL can be used to link to this page
Your browser does not support the video tag.