Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # Description LET/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />U-4726DF Bicycle detection at signalized intersections in Carrboro 3/28/2024 FY2026 $36,000 Plans at 90% completion - Plan review <br />comments returned back to the Town of <br />Carrboro for revisions <br />Town of <br />Carrboro/Stephen <br />Robinson <br />EB-5721 Upgrade existing off-road path and construct new section of <br />path of Bicycle Route #1 from Cleland Drive to Willow Drive <br />in Chapel Hill <br />TBD FY2025 $2,400,000 Bids opened 7/17/23 - Bids rejected. <br />Project on Hold. Chapel Hill to seek <br />additional funding and relet at a future <br />Town of Chapel <br />Hill/Stephen Robinson <br />BL-0044 <br />49998.1.1 <br />NC 54 from Westbrook Drive in Carrboro to west of US <br />15/501/NC 86 (South Columbia Street) interchange in <br />Chapel Hill. Construct sidewalk and install pedestrian <br />signals, crosswalks, and refuge islands at selected <br />locations. <br />9/1/2024 10/31/2024 $1,311,000 Construction funding to be requested <br />once municipal agreements are executed. <br />Chapel Hill MA executed, Carrboro MA <br />has also been executed. Letting date set <br />tentatively September 2024. <br />Chad Reimakoski <br />P-5701 <br />46395.1.1 <br />46395.3.1 <br />Construct Platform, Passenger Rail Station Building at <br />Milepost 41.7 Norfolk Southern H-line in Hillsborough <br />7/1/2024 FY2025 $7,200,000 PE funding scheduled 7/1/2020. Planning <br />and deisgn activities underway <br />Matthew Simmons <br />SS-6207A <br />50337 <br />NC 54 Pedestrian improvements between SR 1902 <br />(Manning Drive) and SR 1937 (Old Fayetteville Road) in <br />Chapel Hill and Carrboro. Improvements will include refuge <br />islands, crosswalks and pedestrian signals. Improvements <br />to be completed by state forces. <br />4/30/2024 10/31/2024 $171,000 Planning and design activities underway. <br />Waiting on materials to arrive. <br />Dawn McPherson <br />51130 Eliminate slip ramp on SR 1120 (Mt. Willing Road) at SR <br />1117 (Oak Grove Church Road) <br />5/31/2024 Summer 2024 $75,000 Funding approved by BOT. Maintenance <br />to begin after Traffic Services revision <br />complete. <br />Matthey Whitley <br />EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro 5/24/2024 FY2026 $372,000 Review comments provided to Carrboro in <br />June 2023 for revisions and resubmittal. <br />Town of <br />Carrboro/Stephen <br />Robinson <br />HL-0045 Repair Bridge #241 on Exchange Park Lane over Eno River <br />from South Churton Street to Faribult Lane in Hillsborough <br />9/26/2024 FY2027 $153,800 Agreement executed, Hillsborough to <br />prepare environmental documents and <br />plans. <br />Town of <br />Hillsborough/Stephen <br />Robinson <br />C-5181 Jones Creek Greenway Project - Fill Gap between the <br />Carrboro Upper Bolin Trail and Twin Creeks Greenway and <br />also implement program to support on-vehicle trips to Morris <br />Grove Elementary School <br />6/21/2024 FY2026 $654,000 Environmental document approved <br />8/14/23. NCDOT to review plans once <br />Carrboro develops and submits. <br />Town of <br />Carrboro/Stephen <br />Robinson <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />Page 1 DCHCMPO Mar 2024
The URL can be used to link to this page
Your browser does not support the video tag.