Orange County NC Website
DURHAM PROJECT LIST <br />5-YEAR PROGRAM <br />FEBRUARY 2024 <br />Project ID Description R/W Acq. <br />Begins <br />Let Date Project Manager Name ROW $UTIL $CON $COMMENTS <br />HS-2005L SR 1327 (GREGSON STREET) AT KNOX STREET. INSTALL TRAFFIC SIGNAL.6/26/2024 ASHLEY LOWERY $110,000 <br />HS-2005D SR 1303 (PICKETT ROAD) AT SR 1116 (GARRETT ROAD)/(LUNA LANE). INSTALL <br />ALL WAY STOP. <br />10/17/2022 4/24/2024 KAYLA NOELLE GALES $2,000 $40,000 <br />HS-2405B NC 157 (GUESS ROAD) FROM DURHAM MUNICIPAL LIMITS TO ORANGE <br />COUNTY LINE. INSTALL LONG LIFE PAVEMENT MARKINGS. <br />4/24/2024 KAYLA NOELLE GALES $223,000 <br />HS-2005E US 15-501 BUSINESS AT NC 751 (DURHAM - CHAPEL HILL BOULEVARD). <br />INSTALLl GUARDRAIL. <br />4/10/2024 KAYLA NOELLE GALES $175,000 <br />HS-2005H SR 1973 (PAGE ROAD) AT CHURCHILL HALL/Aat Churchill HALLl/ARBY'S <br />/MCDONALDS DRIVEWAY. INSTLL DIRECTIONAL CROSSOVER. <br />4/10/2024 KAYLA NOELLE GALES $20,000 <br />HS-2005C NC 54 AT NC 55 3/27/2024 KAYLA NOELLE GALES $75,000 <br />HS-2005M NC 55 (ALSTON AVENUE) AT SR 1670 (GEER STREET). REVISE TRAFFIC <br />SIGNAL AND INSTALL PEDESTRIAN SIGNAL HEADS. <br />3/27/2024 ASHLEY LOWERY $62,000 <br />HE-0007A SR 1004 (OLD OXFORD ROAD) FROM FIRST AVE (MERCK DRVEWAY). <br />CONSTRUCT RIGHT TURN LANE. <br />2/29/2024 JOHN EDWARD SANDOR $165,000 ROW and utility coordination ongoing. <br />I-5941 I-85 FROM ORANGE COUNTY LINE TO US 15 /US 501 IN DURHAM PAVEMENT <br />REHABILITATION <br />2/20/2024 MARK S. GALLO $26,600,000 Construction contract unable to be awarded in February <br />letting. Project will readvertise in spring. <br />Page 2 of 2