Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DURHAM PROJECT LIST <br />5-YEAR PROGRAM <br />FEBRUARY 2024 <br />Project ID Description R/W Acq. <br />Begins <br />Let Date Project Manager Name ROW $UTIL $CON $COMMENTS <br />U-6021 SR 1118 (FAYETTEVILLE ROAD),FROM WOODCROFT PARKWAY TO BARBEE <br />ROAD IN DURHAM. WIDEN TO 4-LANE DIVIDED FACILITY WITH BICYCLE / <br />PEDESTRIAN ACCOMMODATIONS. <br />10/15/2032 1/1/2040 BETH A. QUINN $4,158,000 $379,000 $15,200,000 Project is funded for engineering only in 2024 STIP and <br />remains suspended. <br />U-5516 AT US 501 (ROXBORO ROAD) TO SR 1448 (LATTA ROAD) / SR 1639 (INFINITY <br />ROAD) INTERSECTION IN DURHAM. INTERSECTION IMPROVEMENTS. <br />10/18/2028 10/15/2030 JOHN W. BRAXTON JR $9,290,500 $2,075,000 $12,400,000 Project is funded for engineering only in 2024 STIP and <br />remains suspended. <br />BP5-R117 BRIDGE 110 OVER LITTLE CREEK ON SR 1110 (FARRINGTON ROAD)8/14/2030 LISA B. GILCHRIST, EI $150,000 $3,709,612 <br />BP5-R142 PIPE TO BRIDGE ON (SR 1800) HEREFORD ROAD 7/11/2029 LISA B. GILCHRIST, EI $75,000 $1,500,000 <br />I-6000 I-540 - DURHAM/WAKE COUNTIES FROM I-40 IN DURHAM TO US 1 INRALEIGH. <br />BRIDGE PRESERVATION/REHABILITATION. COORDINATE WITH I-5998 & I-5999. <br />11/21/2028 STEPHEN REID DAVIDSON $7,610,000 <br />U-5717 US 15 / US 501 DURHAM CHAPEL-HILL BOULEVARD AND SR 1116 (GARRETT <br />ROAD) CONVERTING THE AT-GRADE INTERSECTION TO AN INTERCHANGE <br />4/23/2019 10/20/2026 JOHN W. BRAXTON JR $20,413,786 $53,300,000 ROW acquisition ongoing. <br />80105 Riddle Road Widening Expansion of The Building Center - Econ Dev 3/25/2026 STEPHEN REID DAVIDSON <br />SM-6105H SM-6105H - Durham - NC 54 (Miami Boulevard) at SR 1978 (Hopson Road). <br />Construct a southbound right turn lane on NC 54. <br />3/3/2025 3/11/2026 STEPHEN REID DAVIDSON <br />HS-2005N NC 98 AT SR 1919 (LYNN ROAD). TURN LANE CONSTRUCTION.2/19/2025 2/25/2026 MARK S. GALLO $500,000 $1,785,000 Planning and engineering activities underway. <br />I-5995 I-40 - DURHAM/WAKE COUNTIES FROM EAST OF NC 147 TO SR 1728 (WADE <br />AVENUE). PAVEMENT REHABILITATION. INCLUDE I-5996. <br />1/20/2026 STEPHEN REID DAVIDSON $53,500,000 Estimate updated in February. <br />I-5998 I-540 - DURHAM/WAKE COUNTIES FROM I-40 IN DURHAM TO US 70 IN <br />RALEIGH. PAVEMENT REHABILITATION. COORDINATE WITH I-5999 &I-6000. <br />12/16/2025 STEPHEN REID DAVIDSON $24,500,000 Estimate updated in February. <br />HS-2405M US 501 BUS. (ROXBORO ROAD) AT MAYNARD AVENUE. INSTALL TRAFFIC <br />SIGNAL WITH PEDESTRIAN ACCOMMODATIONS AND CONNECT TO THE <br />DURHAM SIGNAL SYSTEM. <br />4/25/2025 9/24/2025 KAYLA NOELLE GALES $25,000 $177,000 <br />SM-6105G SM-6105G - Durham - NC 147 southbound off ramp at SR 1321 (Hillandale Road/ <br />Fulton Street). Widen the NC 147 southbound off ramp to dual right and revise the <br />traffic signal. <br />2/26/2025 STEPHEN REID DAVIDSON Planning and engineering activities underway. <br />HS-2005S NC 98 NC 98 AT SR 1815 (MINERAL SPRINGS ROAD). CONSTRUCT RIGHT <br />TURN LANES AND SIDEWALK. <br />1/29/2024 2/12/2025 STEPHEN REID DAVIDSON $700,000 65% plans. Engineering continuing. <br />HE-0007B SR 1794 (TEKNIKA PARKWAY), FROM SR 1632 (RED MILL ROAD) CONSTRUCT <br />TURN LANES AND SIGNALIZE INTERSECTION. <br />2/23/2024 1/22/2025 MARK S. GALLO $95,000 $815,000 Funding is insufficient for a roundabout. Project team will <br />evaluate costs for turn lane. <br />HS-2405I SR 1110 (BARBEE CHAPEL ROAD) AT DOWNING CREEK <br />PARKWAY/HALESWOOD ROAD. INSTALL TRAFFIC SIGNAL WITH PEDESTRIAN <br />ACCOMMODATIONS. <br />4/19/2024 10/23/2024 KAYLA NOELLE GALES $2,000 $2,000 $120,000 <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.