Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Regional <br />Impact <br />Safety = 25% <br />• Measurement of the number, severity, and density of crashes <br />along the roadway and calculate future safety benefits. <br />Freight = 10% <br />• Measurement of existing truck volume and whether or not the <br />roadway is part of a future interstate highway. <br /> Lane Width = 10% <br />• Measurement of lane width deficiencies compared to the <br />NCDOT standard for each roadway facility type. <br /> Pavement Condition = 10% <br />• Measurement of overall pavement condition using the <br />NCDOT’s pavement condition rating (PCR). <br />Paved Shoulder Width = 10% <br />• Measurement of paved shoulder width deficiencies compared <br />to the NCDOT standard for each roadway facility type <br />Congestion = 5% <br />• Measurement of the traffic volume on the roadway compared to the <br />existing capacity of the roadway, weighted by the traffic volume <br />along the roadway. <br />Total = 70% (Division Engineer and Local Input Points account for <br />remaining 30%) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />15% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />15% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Division <br />Needs <br />Safety = 20% <br />• Measurement of the number, severity, and frequency of <br />crashes along the roadway. <br />Pavement Condition = 10% <br />• Measurement of overall pavement condition using the <br />NCDOT’s pavement condition rating (PCR). <br />Paved Shoulder Width = 10% <br />• Measurement of paved shoulder width deficiencies compared <br />to the NCDOT standard for each roadway facility type. <br />Freight = 5% <br />• Measurement of truck volume and truck percentage of total <br />traffic on the roadway, and the degree the project is helping to <br />complete a future interstate corridor (if applicable). <br />Lane Width = 5% <br />• Measurement of lane width deficiencies compared to the <br />NCDOT standard for each roadway facility type. <br />Total = 50% (Division Engineer and Local Input Points account for <br />remaining 50%) <br /> <br />25% 25% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.