Orange County NC Website
4 <br /> <br />DCHC MPO GOALS FOR THE METHOLDOGY FOR IDENTIFYING AND RANKING TIP <br />PROJECTS <br /> <br />The Methodology for Identifying and Ranking TIP Projects should result in a list of projects that <br />are a subset of the DCHC MPO Metropolitan Transportation Plan (MTP). For this reason, the <br />goals for the Methodology are the same as the adopted goals for the 2050 MTP. The goals of <br />the 2050 MTP are as follows: <br />• Protect the human and natural environment and minimize climate change <br />• Ensure equity and participation <br />• Connect people and places <br />• Ensure that all people have access to multimodal and affordable transportation choices <br />• Promote safety, health, and well-being <br />• Improve infrastructure condition and resilience <br />• Manage congestion and system reliability <br />• Stimulate inclusive economic vitality <br /> <br />PROCEDURE FOR IDENTIFYING PROJECTS FOR SUBMISSION TO NCDOT SPOT FOR <br />EVALUATION <br /> <br />1) Submission of Local Priority Lists to the MPO <br /> <br />All MPO member jurisdictions and agencies will submit a local priority list to the MPO. The <br />DCHC MPO requests that the MPO members apply initial screening criteria during the <br />development of their respective lists. The initial screening criteria are listed below in this <br />section. In addition to the initial screening criteria, MPO members may also want to consider <br />reviewing Section 2 of this Methodology for guidance on the NCDOT’s SPOT scoring <br />criteria. The DCHC MPO will apply the NCDOT’s scoring criteria when considering new <br />project requests from DCHC MPO member jurisdictions and agencies. If a project exists in <br />more than one jurisdiction, all jurisdictions must be in agreement on the proposed scope and <br />details of the project. <br /> <br />Initial Screening Criteria <br />a) Regional Goals - How well does the project meet the adopted regional goals? Is the <br />project an element of the current MTP? Does it implement community objectives? For <br />the intrastate system, does it meet NCDOT mobility objectives? Does the project have a <br />broad base of local support? <br /> <br />b) Cost Effectiveness - How much benefit does the project offer compared to the estimated <br />cost? <br /> <br />c) Timing – Is the project needed within the TIP funding cycle? Is timing a critical element <br />for the project (one-time opportunity)? Will the opportunity to do the project be lost if it is <br />not in the current priority cycle? <br /> <br />DCHC MPO staff and the TC will review local priority lists for adherence to the initial <br />screening criteria and apply the NCDOT scoring criteria listed in Section 2 of this <br />Methodology, before recommending the submission of these projects to Prioritization 7.0. <br /> <br /> <br /> <br />