Orange County NC Website
10 <br /> <br />The rationale for LIP assignments made by the TAC and/or via public input that deviate from the methodology <br />described above will be placed on the BGMPO website. The public input process may be adjusted to meet <br />NCDOT imposed deadlines or data requirements. The BGMPO will release the draft list of proposed STI projects <br />and the proposed local ranking methodology for public review and comment according to the above schedule. <br />P7.0 project scores will be available for review at the BGMPO office and posted on the BGMPO website at <br />www.bgmpo.org. <br /> <br />Wannetta Mallette, PTP <br />MPO Administrator <br />Burlington-Graham MPO <br />PO Box 1358 <br />Burlington, NC 27215-1358 <br />(336) 513-5418 <br />wmallette@burlingtonnc.gov <br />