Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />Facility Projects: <br />Statewide Mobility Regional Impact Division Needs <br />(not eligible) (not eligible) <br />15% Cost Effectiveness <br />15% Impact <br />10% Demand/Density <br />10% Efficiency <br /> <br /> <br /> <br />Rail Criteria & Weights: <br />Statewide Mobility Regional Impact Division Needs <br />40% NCDOA Project Rating 30% NCDOA Project Rating 25% NCDOA Project Rating <br />30% FAA ACIP Rating 15% Benefit/Cost 10% Benefit/Cost <br />20% Benefit/Cost 15% FAA ACIP Rating 10% FAA ACIP Rating <br />10% Constructability Index 10% Constructability Index 5% Constructability Index <br /> <br /> <br />Cascading <br />During the prioritization process, projects can “cascade down” from one funding category into another. For <br />example, if a project in the Statewide Mobility funding category is unsuccessful at being funded, the project may <br />cascade into the Regional Impact and/or Division Needs funding categories to be funded. The same may be <br />applied to Regional Impact projects which may cascade to the Division Needs funding category. Projects may <br />not “cascade up” (i.e. Division Needs to Regional Impact or Statewide Mobility). Projects that cascade down are <br />then subject to the scoring criteria and local input for the respective funding category. The BGMPO TAC reserves <br />the right to evaluate cascading projects on a case-by-case basis to strategically assist with funding of projects. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.