Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Mobility Projects (Roadway Widening, Intersection/Interchange Improvements, Access Management): <br />Statewide Mobility Regional Impact Division Needs <br />30% Congestion 20% Benefit Cost 15% Benefit Cost <br />25% Benefit Cost 20% Congestion 15% Congestion <br />25% Freight 10% Accessibility/Connectivity 10% Safety <br />10% Economic Competitiveness 10% Freight 5% Accessibility/Connectivity <br />10% Safety 10% Safety 5% Freight <br /> <br />Modernization Project (Modernize Roadway, Upgrade Freeway to Interstate): <br />Statewide Mobility Regional Impact Division Needs <br />25% Freight 25% Safety 20% Safety <br />25% Safety 10% Freight 10% Pavement Condition <br />20% Paved Shoulder Width 10% Lane Width 10% Paved Shoulder Width <br />10% Congestion 10% Pavement Condition 5% Freight <br />10% Lane Width 10% Paved Shoulder Width 5% Lane Width <br />10% Pavement Condition 5% Congestion <br /> <br />Aviation Criteria & Weights <br />Statewide Mobility Regional Impact Division Needs <br />40% NCDOA Project Rating 30% NCDOA Project Rating 25% NCDOA Project Rating <br />30% FAA ACIP Rating 15% Benefit/Cost 10% Benefit/Cost <br />20% Benefit/Cost 15% FAA ACIP Rating 10% FAA ACIP Rating <br />10% Constructability Index 10% Constructability Index 5% Constructability Index <br /> <br />Bicycle, Pedestrian, and Transit Projects <br />Bicycle, Pedestrian, and Transit projects in the BGMPO planning area are only eligible for funding in the Division <br />Needs category. These projects require a local match from local governments or transit operators to be <br />successfully implemented. <br />Statewide Mobility Regional Impact Division Needs <br />(Not eligible) (Not eligible) <br />20% Safety <br />15% Accessibility/Connectivity <br />10% Demand/Density <br />5% Cost Effectiveness <br /> <br />Public Transportation Criteria & Weights <br />Mobility Projects: <br />Statewide Mobility Regional Impact Division Needs <br />(not eligible) <br />25% Cost Effectiveness 20% Cost Effectiveness <br />20% Demand/Density 10% Demand/Density <br />15% Impact 10% Efficiency <br />10% Efficiency 10% Impact <br /> <br />Demand Response Projects: <br />Statewide Mobility Regional Impact Division Needs <br />(not eligible) <br />25% Cost Effectiveness 15% Cost Effectiveness <br />20% Demand/Density 15% Demand/Density <br />15% Efficiency 10% Efficiency <br />10% Impact 10% Impact <br />
The URL can be used to link to this page
Your browser does not support the video tag.