Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
# Route/Facility Name From/Cross StreetDescriptionProject CategoryCounty Location SPOT ID Preliminary Score P7 SubmitterB1 NCRR/NC Line Mt. Willing RdThis project would realign Mt. Willing Road to line up with Efland Cedar Grove Road at US 70 and would remove the at‐grade crossing (735 145T) of the Norfolk Southern Rail Line at mile post H‐37.31 and would construct a bridge over this line. This line serves as a connect from Greensboro to Durham. Statewide MobilityOrange R19132165.74, 43.29, 31.53 Division 7B2NCRR/CSX S, NCRR/NC,NCRR/NS MainPiedmont Corridor: Raleigh to Charlotte6th frequency addition to Charlotte to Raleigh service. Requires improvements to NC Line between Greensboro and Raleigh.Regional ImpactDurham, Orange R190772 N/A, 17.11, 13.76 BGMPOB3NCRR/NC LineNS/NCRR H Line crossing of Dimmocks Mill Road in Hillsborough.Construction of grade separation at Dimmocks Mill Road (Crossing # 735 154S) and closure of Bellvue Street existing at‐grade crossing (Crossing # 735 152D) and West Hill Avenue existing at‐grade crossing (Crossing # 735 151W). Project includes a pedestrian tunnel at Hill Avenue.Statewide MobilityOrangeR15031871.43, 46.08, 34.52Requested for Division 7SPOT 7.0 DCHC MPO Rail Submittal ListProjects Potentially Submitted by Others**Note: DCHC is allowed (24) submittals per mode for SPOT 7.0. Carryover projects already in the STIP are not included in this submission. The primary purpose of rail projects must be to improve railroad operations*Projects in this category are listed in no particular order and projects need to be narrowed down to only 24. Projects listed with preliminary scores in this sheet were scored in a previousprioritization cycle and scores are subject to change due to updated scoring criteria as well as if the project itself is modified.**Projects in this category are expected to be submitted by other MPOs, RPOs, or Divisions. All partners work together to avoid duplication of project submittals, as well as to submit as many high‐scoring projects as possible.August 23, 2023Updated 8/17/2023 5:00PMPage 5 of 5
The URL can be used to link to this page
Your browser does not support the video tag.