Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
# Route/Facility Name From/Cross Street DescriptionProject CategoryCounty Location SPOT IDPreliminary Score(S, R, D)SPOT 7.0 DCHC MPO Rail Submittal ListAugust 23, 2023A24 NCRR/NC LineBundled Pedestrian/Bicycle Improvements at Rail Crossings in DurhamInstall wheelchair ramps, crosswalks, and relocate stop bars for pedestrian access at SR 1118 (Fayetteville Street) (Crossing # 910 605Y)Install decorative fence and restricted access fence, streetscape lights, wheelchair ramps, sidewalk, and cluster traffic signal cabinets at Blackwell/Corcoran Street (Crossing # 735 229N) in Durham. Install wheelchair ramps and crosswalks for pedestrian access at SR 1445 (Duke Street) (Crossing # 735 227A)Widen shoulders within railroad ROW and install wheelchair ramps and crosswalks on SR 1322 (Swift Avenue) (Crossing # 735 223X) in Durham.Install wheelchair ramps and crosswalk for pedestrian access at Buchanan Boulevard (Crossing # 735 225L)Install decorative fence, streetscape lights, wheelchair ramps, and sidewalk at US 15 Bus (Mangum Street) (Crossing # 735 231P) Statewide MobilityDurham N/A PendingNote: DCHC is allowed (24) submittals per mode for SPOT 7.0. Carryover projects already in the STIP are not included in this submission. The primary purpose of rail projects must be to improve railroad operations*Projects in this category are listed in no particular order and projects need to be narrowed down to only 24. Projects listed with preliminary scores in this sheet were scored in a previous prioritization cycle and scores are subject to change due to updated scoring criteria as well as if the project itself is modified.**Projects in this category are expected to be submitted by other MPOs, RPOs, or Divisions. All partners work together to avoid duplication of project submittals, as well as to submit as many highâscoring projects as possible.Updated 8/17/2023 5:00PMPage 4 of 5
The URL can be used to link to this page
Your browser does not support the video tag.