Orange County NC Website
# Route/Facility Name From/Cross Street DescriptionProject CategoryCounty Location SPOT IDPreliminary Score(S, R, D)SPOT 7.0 DCHC MPO Rail Submittal ListAugust 23, 2023A24 NCRR/NC LineBundled Pedestrian/Bicycle Improvements at Rail Crossings in DurhamInstall wheelchair ramps, crosswalks, and relocate stop bars for pedestrian access at SR 1118 (Fayetteville Street) (Crossing # 910 605Y)Install decorative fence and restricted access fence, streetscape lights, wheelchair ramps, sidewalk, and cluster traffic signal cabinets at Blackwell/Corcoran Street (Crossing # 735 229N) in Durham.  Install wheelchair ramps and crosswalks for pedestrian access at SR 1445 (Duke Street) (Crossing # 735 227A)Widen shoulders within railroad ROW and install wheelchair ramps and crosswalks on SR 1322 (Swift Avenue) (Crossing # 735 223X) in Durham.Install wheelchair ramps and crosswalk for pedestrian access at Buchanan Boulevard (Crossing # 735 225L)Install decorative fence, streetscape lights, wheelchair ramps, and sidewalk at US 15 Bus (Mangum Street) (Crossing # 735 231P)      Statewide MobilityDurham N/A PendingNote: DCHC is allowed (24) submittals per mode for SPOT 7.0. Carryover projects already in the STIP are not included in this submission. The primary purpose of rail projects must be to improve railroad operations*Projects in this category are listed in no particular order and projects need to be narrowed down to only 24. Projects listed with preliminary scores in this sheet were scored in a previous prioritization cycle and scores are subject to change due to updated scoring criteria as well as if the project itself is modified.**Projects in this category are expected to be submitted by other MPOs, RPOs, or Divisions. All partners work together to avoid duplication of project submittals, as well as to submit as many high‐scoring projects as possible.Updated 8/17/2023 5:00PMPage 4 of 5