Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPOT 7.0 DCHC MPO Bicycle and Pedestrian Submittal ListAugust 23, 2023Projects Potentially Submitted by Others**# Route/Facility Name From/Cross Street To/Cross Street Description Project Category SIT Jurisdiction Division Region SPOT ID P6.0 Score Original P7.0 SubmitterSubmitted by DCHC MPO for Consideration on Division 7 List1East Franklin Street SidepathBooker Creek GreenwayBolin Creek GreenwayConstruct sidepath along north side of Franklin Street to connect Bolin and Booker Creek Greenways.Division Needs2 ‐ Off‐Road/Separated Linear Bicycle Facility (Bicycle)Town of Chapel Hill7 D B192919 43.06Town of Chapel Hill / Division 72Estes DriveCaswell RdEast Franklin StreetConstruct a sidewalk on the south side of the street and a multiuse path on the north side of the street.Division Needs2 ‐ Off‐Road Designated Bicycle FacilityTown of Chapel Hill7 D B192899 40.55Town of Chapel Hill / Division 73SR 1843 (Seawell School Road)SR 1777 (Homestead Road)SR 1780 (Estes Drive Extension)Construct a sidepath along the entire corridor from Estes Drive to Homestead Road.Division Needs2 ‐ Off‐Road/Separated Linear Bicycle Facility (Shared‐Use Path/Multi Use Path)Town of Carrboro7 D B171175 37.99 Town of Carrboro4Campus to Campus GreenwayBroad StreetVillage Drive and Tanyard Branch GreenwayConstruct an off‐road multi‐use path providing a safe connection between downtown Chapel Hill, Carrboro, and the rest of the greenway network.Division Needs2 ‐ Off‐Road/Separated Linear Bicycle Facility (Bicycle)Town of Chapel Hill7 D B15025832.61Town of Chapel Hill5Bolin Creek Greenway ExtensionEstes Drive Umstead ParkThis project would connect the 2.5 mile Bolin Creek Greenway to the planned 1.7 miles of bicycle and pedestrian improvements on Estes Drive Extension, completing a key east‐west connection and connecting Chapel Hill and Carrboro. Division Needs2 ‐ Off‐Road/Separated Linear Bicycle Facility (Bicycle)Town of Chapel Hill7 D B193180 32.28 Town of Chapel Hill6SR 1008 (Mt. Carmel Church Road)US 15/501SR 1913 (Bennett Road)Construct a multi‐use sidepath on one side of Mt. Carmel Church Road.Division Needs2 ‐ Off‐Road/Separated Linear Bicycle Facility (Bicycle)Town of Chapel Hill7 D B170403 31.9 Town of Chapel Hill7Ephesus Church Road SidewalkPinehurst Drive/Sharon RoadPope RoadConstruct sidewalks and bike lanes along both sides of Ephesus Church RoadDivision Needs7 ‐ Protected Linear Pedestrian Facility (Pedestrian)Town of Chapel Hill7 D B193177 27.83 Town of Chapel Hill8Old NC 86 ‐ Hillsborough RoadSR 1777 (Homestead Road)Farm House DriveConstruct bicycle lanes on both sides of roadway and a sidewalk along the north/east side of roadway to extend existing bike lanes and sidewalk at Farm House Road to Homestead/Dairyland Rd intersection at Calvander.Division Needs3 ‐ On‐Road Designated Bicycle Facility (Bicycle)Town of Carrboro7 D B150435 n/a Town of CarrboroPage 6 of 7
The URL can be used to link to this page
Your browser does not support the video tag.