Orange County NC Website
SPOT 7.0 DCHC MPO Bicycle and Pedestrian Submittal ListAugust 23, 202320 I‐85 Pedestrian Bridge Flat Ford RoadBeckett's Ridge DriveConstruct a pedestrian bridge across I‐85 to connect downtown Hillsbrough, the future train station, Collins Ridge, and Daniel Boone area to southern neighborhoods including Waterstone, Becketts Ridge, Cornwallis Hills, and future planned developments.   Listed as project name "I‐40/New Hillborough collector road" with description of Bicycle/pedestrian bridge over I‐85 in CTP.Division Needs6 ‐ Grade‐Separated Pedestrian FacilityTown of Hillsborough 7DN/AN/ATown of Hillsborough21 Weaver Dairy Road Sidewalk Sage RoadErwin Road Construct a sidewalk on one side of Weaver Dairy Road.Division Needs6 ‐ Grade‐Separated Pedestrian Facility (Pedestrian)Town of Chapel Hill 7DN/AN/A Town of Chapel Hill22 Erwin RdCameron Blvd Flowers DrConstruct shared use sidepaths on both sides of Erwin Rd from Cameron Blvd to Flowes Dr.Division Needs2 ‐ Off‐Road / Separated Linear Bicycle Facility (Bicycle)City of Durham5CN/AN/A City of Durham23Orange High School Road/Harold Latta Road Sidewalk ImprovementsHarold Latta Road US 70Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S. 70, construct a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road, install high visibility crosswalks and in‐road signage at school entrances and exits on Orange Grove Road, and construct a sidewalk along entrance roads to CW Stanford MiddleSchool.Division Needs7 ‐ Protected Linear Pedestrian FacilityOrange County7DN/AN/A Orange County24Downtown Rail Trail To R. Kelly Bryant Bridge TrailDurham Rail Trail at Avondale DrDrew St / Granby St IntersectionConstruct a multimodal trail facility to connect the Downtown Rail Trail to the R Kelly Bryant Bridge Trail.Division Needs2 ‐ Off‐Road / Separated Linear Bicycle Facility (Bicycle)City of Durham5CN/AN/A City of DurhamPage 3 of 7