Orange County NC Website
# Route/Facility Name From/Cross Street To/Cross Street Description Project Category SITJurisdiction SPOT IDPreliminary Score(S, R, D)A1Townwide Signal System Upgrade ‐ Chapel Hill/CarrboroN/AN/APlan and implement an improved signal system for the Town of Chapel Hill and the Town of Carrboro including transit signal priority.Statewide Mobility13 ‐ Citywide Signal SystemChapel Hill N/A PendingA2Townwide Signal System Upgrade ‐ HillsboroughN/AN/APlan and implement an improved signal system for the Town of Hillsborough including consideration for transit signal priority.Statewide Mobility13 ‐ Citywide Signal SystemOrange County/Town of HillsboroughN/A PendingA3NC 98 (Holloway Street)SR 1919 (Lynn Road)SR 1815 (Mineral Springs Road)Install a median to manage access and improve safety, as well as pedestrian, bicycle, and transit accommodations.Regional Impact11 ‐ Access ManagementCity of Durham H190419 N/A, 42, 35.15A4Cornwallis Rd / NC 55 Intersection ImprovementsCornwallis Rd / NC 55 Intersection‐Improve intersection to enhance safety and provide multimodal accommodationsRegional Impact10 ‐ Improve IntersectionCity of Durham N/A PendingA5SR 1006 (Orange Grove Road)SR 1148 (Eno Mountain Road)SR 1192 (Mayo Street)Create two roundabouts along Orange Grove Road, one at Eno Mountain Road and one at Mayo Street.Division Needs25 ‐ Improve Multiple Intersections along CorridorHillsborough, Orange CountyH192437 N/A, N/A, 21.47A6Orange Grove Road (SR‐1102) Widening with Bicycle and Pedestrian ImprovementsPatriot's Pointe DriveNew Grady Brown School Road (SR‐1221)Construct one additional lane between Patriot's Pointe Drive and New Grady Brown School Road (SR 1221) to include both pedestrian and bicycle improvements along the roadway. The 1‐40 bridge would be widened to accommodate both pedestrian and bicycle amenities and one additional travel lane.Division Needs1 ‐ Widen Existing RoadwayOrange County N/A PendingA7US 501 (Roxboro Road)Omega RoadUS 501 Bypass (Duke Street)Construct median as an access management facility, with bicycle and pedestrian facilities and transit stop improvements.Regional Impact11 ‐ Access ManagementCity of Durham H170126 N/A, 46.91, 38.56A8US 70 Business (Hillsborough Road)SR 1314 (Neal Road)Install a one‐lane roundabout.Regional Impact10 ‐ Improve IntersectionCity of DurhamH190418N/A, 46.99, 37.04A9US 15/501 Upgrade (modernization)I‐40US 15/501 BusinessUpgrade US 15/501 in Durham to a boulevard from I‐40 to US 15/501 Business. Intersection improvement at Mount Moriah. Extend Danziger Drive over I‐40. Add priority transit infrastructure.Regional Impact16 ‐ Modernize RoadwayCity of Durham N/A PendingA10 NC 98SR 1811 (Sherron Road / Patterson Road)Per the NC 98 Corridor Study, construct a quadrant road at this intersection to reduce congestion and create travel time savings.Regional Impact10 ‐ Improve IntersectionCity of Durham H192687 N/A, 45.87, 37.93A11 NC 98Ganyard Farm Nichols FarmConstruct a median for access management, as well as sidewalks and/or a shared use path and transit accommodationsRegional Impact11 ‐ Access ManagementDurham County N/A PendingA12US 501 (Roxboro Road)SR 1004 (Old Oxford Road)NC 55 (Avondale Drive)Construct median along section with potential turn lanes at Lavender Avenue, Bon Air Avenue, and Murray Avenue. Fill in sidewalk gaps, provide streetscape amenities, and install bus stop improvements.Regional Impact11 ‐ Access ManagementCity of Durham H170375 N/A, 48, 43.29A13New Route ‐ Northern Durham ParkwayUS 70Sherron ParkwayConstruct roadway on new location and widen Northern Durham Parkway from US 70 to Sherron Road to provide four lanes with a median with bicycle, pedestrian, and transit facilities as appropriate.Division Needs5 ‐ Construct Roadway on New LocationDurham City/ County H171433 N/A, N/A, 28.35SPOT 7.0 DCHC MPO Highway Submittal ListAugust 23, 2023Project Submissions (DCHC MPO is allotted 24)*Page 2 of 5