Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TARPO's Draft Recommended Prioritization 7.0 List for New Submittals <br /> (Highway, Bike/Ped Aviation) <br />8/10/2023 <br />County County Mode SPOT ID Route / Facility / Project Name <br />From / Cross Street / <br />Location To / Cross Street Description Notes <br />101 CHATHAM Bike/Ped B192447 <br />SR 1006 (North Second Avenue) / <br />Cottage Grove Avenue 4th Street W. 11th Street <br />Construct sidewalk on west side of street. From E. 4th <br />St. to W. 11th St. <br />102 CHATHAM Bike/Ped B192452 <br />SR 1107 (East Third Street) / North <br />Avenue N. 2nd Ave.Mountaire Sidewalk <br />Construct sidewalk on north side of East Third Street. <br />From N. 2nd Ave. to terminus of Mountaire Sidewalk <br />project (south of North Ave) <br />103 CHATHAM Bike/Ped B192453 <br />SR 1107 (East Third Street) / North <br />Tenth Avenue 4th Avenue E. Raleigh St. <br />Construct sidewalk along south side of East Third <br />Street, and along one side of North Tenth Avenue. <br />From 4th Ave. to E. Raleigh St. <br />104 CHATHAM Bike/Ped B192837 <br />East Fourth Street/Pine Glade <br />Avenue N. 5th Ave.E. 11th St. <br />Construct sidewalk on north/east side of street. From <br />N. 5th Ave. to E. 11th St. <br />105 CHATHAM Bike/Ped New US 15/501 US 64 Business <br />Signalized Pedestrian crossings at traffic circle at US <br />15/501 and US 64 Bus <br />106 CHATHAM Bike/Ped New Various <br />Five (5) Intersection Pedestrian Crossing <br />Improvements. Three On Us 64 Bus At Mcclenahan St, <br />Small St, Martin Luther King Drive, And Two On Us <br />15/501 At Chatham St, Pittsboro Elementary School <br />Rd <br />107 CHATHAM Bike/Ped B192901 Fir Avenue/West Elk Street West Third Street West Elk Street <br />Construct sidewalk on Fir Avenue from West Third <br />Street to West Elk Street, and on West Elk Street from <br />Fir Avenue to West Raleigh Street. <br />108 CHATHAM Bike/Ped New Martin Luther King Dr & US 64 Bus E US 64 Business <br />End of Martin <br />Luther King <br />Multi-Use 10-Ft Pedestrian Path To Replace Existing <br />Sidewalk On Martin Luther King Drive And Us 64 Bus <br />East To Connect Chatham Park And The Downtown <br />District <br />121 LEE Bike/Ped B171472 SR 1515 (Third St) <br />SR 1560 <br />(Weatherspoon St) <br />NC 87 (Horner <br />Blvd) <br />Install median refuge islands at six intersections. Add <br />sidewalks at railroad crossing (sidewalk gap), <br />including rail ROW. Add sidewalk curb ramps at <br />multiple locations if needed. <br />3 - On-Road Designated <br />Bicycle Facility (Bicycle) <br />122 LEE Bike/Ped B192478 SR 1415 (Seventh Street) <br />SR 1560 <br />(Weatherspoon Street) <br />SR 1514 (Bragg <br />Street) <br />Construct sidewalks on both sides. Install median <br />refuge islands at six intersections. <br />7 - Protected Linear <br />Pedestrian Facility <br />(Pedestrian) <br />123 LEE Bike/Ped B192481 Hill Avenue <br />US 1 Business (Hawkins <br />Avenue) <br />US 421 <br />Business/NC 87 <br />(Horner <br />Boulevard) <br />Construct sidewalk and install bike lanes while <br />allowing off street parking if possible. <br />7 - Protected Linear <br />Pedestrian Facility <br />(Pedestrian) <br />DRAFT- Subject to Change 1
The URL can be used to link to this page
Your browser does not support the video tag.