Orange County NC Website
SPOTID Submitter Funding <br />Category Project From Specific <br />Improvement Type <br />Estimated <br />Total Project <br />Cost <br />Division Needs <br />Quantitative <br />Score <br />(Out of 50) <br />1 A230410 <br />(A151063) <br />Alamance <br />Aviation <br />Authority <br />BUY - <br />Burlington - <br />Alamance <br />Regional Airport: <br />Aviation <br />Terminal <br />Building and <br />Terminal Area <br />Development <br />Location of new terminal to <br />be determined. Project is <br />within BGMPO and City of <br />Burlington <br />1305 - GA Terminal <br />Bldg: New <br />Construction <br /> $ 25,000,000 TBD <br />SpotID Submitter Funding <br />Category Project From Specific <br />Improvement Type <br />Estimated <br />Total Project <br />Cost <br />Division Needs <br />Quantitative <br />Score <br />1 R230091 Mebane Division Needs <br />New Amtrak/light rail station <br />in Downtown Mebane to <br />provide commuter services <br />A new station will relieve <br />commuter needs between <br />Mebane and surrounding <br />urban areas. <br /> 4 - Passenger rail <br />station improvement <br />or construction <br />(point) <br /> $ 10,000,000 TBD <br />2 R230408 <br />(R190351)Mebane Division Needs <br />The intersection of Buckhorn <br />Road and the railway. <br />Between E Washington Street <br />and S Frazier Road. <br />East of Frazier Road of a <br />realigned SR 1114 <br />(Buckhorn Road) <br /> 3 - Highway-rail <br />crossing <br />improvement (point) <br />TBD TBD <br />3 R230409 <br />(R190451)Orange County Division Needs Mattress Factory Road E Washington Street US 70 TBD TBD <br />4 R230586 Rail Division Division Needs <br />NS Main Line, NCRR NC <br />Line, and the S Line <br />Division5,7,9,10 <br />Western to Eastern <br />BGMPO Boundary 5 - Passenger service TBD TBD <br />5 R230587 Rail Division Division Needs <br />Winston-Salem to Raleigh on <br />the NC Line and K Line <br />Division 5,7,9 <br />Western to Eastern <br />BGMPO Boundary 5 - Passenger service TBD TBD <br />SpotID Submitter Funding <br />Category Project From Specific <br />Improvement Type <br />Estimated <br />Total Project <br />Cost <br />Division Needs <br />Quantitative <br />Score <br />1 <br />T230413 Burlington Division Needs Purchase seven fixed route <br />expansion buses <br />6 - Facility - <br />Stop/Shelter $ 4,725,000 TBD <br />2 T230414 Burlington Division Needs Purchase 25 bus shelters 9 - Facility - <br />Maintenance $ 825,000 TBD <br />3 <br />T230412 Burlington Division Needs <br />Construct transit operations <br />and maintenance facility <br />2 - Mobility (Route <br />Specific) Headway <br />Reduction <br /> $ 2,500,000 TBD <br />4 <br />T230415 Burlington Division Needs <br />Provide expanded transit <br />services through headway <br />reduction on five routes, plus <br />paratransit <br />5 - Facility - <br />Passenger Station $ 1,800,000 TBD <br />5 T230416 Burlington Division Needs Construct transit transfer <br />facility <br />7 - Facility - Park <br />and Ride $ 6,750,000 TBD <br />6 <br />T230411 <br />(T190598) <br />Mebane Division Needs <br />Mebane Park and Ride Lot <br />Final location to be <br />determined but generally in <br />the vicinity between I-40 <br />and Mebane Oaks Road <br />4 - Demand <br />Response TBD TBD <br />7 <br />T231030 Alamance County <br />Transportation <br />Authority <br />Division Needs ACTA Deviated fixed route <br />and demand response <br />expansion vehicles <br />4 - Demand <br />Response $ 1,111,600 TBD <br />8 <br />T231031 Alamance County <br />Transportation <br />Authority <br />Division Needs ACTA Deviated fixed route <br />and demand response <br />expansion <br /> $ 605,000 TBD <br />PUBLIC TRANSIT <br />AVIATION <br />RAIL <br />BGMPO DRAFT P7.0 NON-HIGHWAY PROJECT LIST <br />October 2023