Browse
Search
04.15.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
04.15.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 4:44:03 PM
Creation date
4/17/2024 4:43:23 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BGMPO Submission <br />Number (Pending <br />TAC Approval) <br />SPOT ID <br />Express <br />Design <br />SPOT ID <br />Submitter Project <br />Category Route From / Cross <br />Street To Specific Improvement Type Cost <br />Statewide Mobility <br />Quantitative Score <br />(Out of 100) <br />Regional Impact <br />Quantitative Score <br />(Out of 70) <br />Division Needs <br />Quantitative Score <br />(Out of 50) <br />1 <br />H230379 <br />(H190403) <br />H191528 <br />Burlington Regional Impact NC 49 Plaza Drive NC 54 25 - Improve Multiple <br />Intersections along Corridor $ 5,424,000 <br />0.00 55.31 40.01 <br />2 H230329 <br />(H191089)Burlington Regional Impact US 70 South Main Street 10 - Improve Intersection $ 5,424,000 0.00 51.03 37.73 <br />3 <br />H230380 <br />(H190453) <br />H191529 <br />Burlington Regional Impact NC 49 NC 54 Anthony Rd 11 - Access Management <br /> $ 9,031,000 <br />0.00 49.83 35.44 <br />4 H230565 <br />(H185327)Graham Regional Impact NC 87 <br />Swepsonville <br />Saxapahaw Rd/NC <br />87/Nicks Street <br />10 - Improve Intersection <br /> $ 5,424,000 <br />0.00 46.88 34.74 <br />5 H230393 <br />(H191377)Graham Regional Impact NC 49 (NC 49, NC <br />54)West Elm Street 10 - Improve Intersection $ 5,424,000 0.00 45.98 33.72 <br />6 H230566 <br />(H184678)BGMPO Regional Impact <br />Jimmie Kerr Road / <br />Trollingwood Road <br />(NC 49) <br />US 70 Green Level Church <br />Road (SR 1747)16 - Modernize Roadway <br /> $ 21,592,000 <br />0.00 43.41 32.55 <br />7 H230572 <br />(H172028)Burlington Division Needs SR 1158 (Huffman <br />Mill Road)Garden Road 10 - Improve Intersection $ 1,752,000 0.00 0.00 35.76 <br />8 H230360 <br />(H190623)Burlington Division Needs Main Street Ext.West Front Street East Webb Avenue 5 - Construct Roadway on New <br />Location $ 2,381,000 0.00 0.00 33.50 <br />9 H230578 <br />(H171117)Graham Division Needs N. Main Street <br />SR 2396 W. Parker <br />Street 10 - Improve Intersection $ 5,424,000 0.00 0.00 32.56 <br />10 H230368 <br />(H190367)Burlington Division Needs SR 1308 (Garden <br />Road)Boone Station Drive 10 - Improve Intersection $ 3,504,000 0.00 0.00 31.54 <br />11 H230066 Mebane Division Needs Lowes Boulevard <br />Ext.Lowes Boulevard <br />Trollingwood- <br />Hawfields Rd/NC <br />119 <br />5 - Construct Roadway on New <br />Location $ 16,128,000 <br />0.00 0.00 30.20 <br />12 H230328 <br />(H191781)Burlington Regional Impact NC 62 Anthony Road Kirkpatrick Road 21 - Realign Multiple <br />Intersections $ 10,705,000 0.00 39.68 30.01 <br />13 H230097 <br />(H190583)Gibsonville Regional Impact US 70 (South <br />Church Street)Ashley Woods Dr. 10 - Improve Intersection $ 1,752,000 0.00 39.41 29.75 <br />14 H230580 <br />(H184087)H184087 Village of <br />Alamance Regional Impact NC 62 <br />NC 62/Bellemont <br />Alamance Road (SR <br />1136)/Friendship <br />Patterson Mill Road <br />(SR 1130) <br />10 - Improve Intersection <br /> $ 5,424,000 <br />0.00 37.61 28.00 <br />15 H230071 <br />(H190576)Mebane Regional Impact US 70 Moore Street & <br />Woodlawn Rd <br />21 - Realign Multiple <br />Intersections $ 3,611,000 0.00 36.98 26.53 <br />16 H230331 <br />(H191012)H171172 Burlington Regional Impact NC 49 (Maple <br />Avenue)Henry Road I-40/85 16 - Modernize Roadway $ 8,129,000 0.00 35.09 29.62 <br />HIGHWAY PRELIMINARY SCORES PER P7.0 TESTING SHEET <br />Burlington - Graham MPO Draft P7.0 Project List <br />October 2023 <br />Page 1
The URL can be used to link to this page
Your browser does not support the video tag.