Browse
Search
Agenda 04-16-24; 8-f - Approval of Orange County Agreement – Freeway, Arterial, Street, and Tactical (FAST) 2.0 Study
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 04-16-2024 Business Meeting
>
Agenda 04-16-24; 8-f - Approval of Orange County Agreement – Freeway, Arterial, Street, and Tactical (FAST) 2.0 Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 10:25:38 AM
Creation date
4/11/2024 10:20:32 AM
Metadata
Fields
Template:
BOCC
Date
4/16/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Agenda for April 16, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 04-16-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> ACCOUNTS RECEIVABLE <br /> NCDOT ADMINISTERED—FAST TRANSIT PRIORITY STUDY <br /> 1000019673 <br /> 1. Project Management Plan <br /> 2. Community Engagement <br /> 3. Information Gathering and Review of Existing Conditions <br /> 4. Vision and brand for multimodal transportation in the Triangle Region <br /> 5. Actionable materials for planners and other transit and transportation professionals <br /> 6. Accessible marketing materials for the public to gain understanding and support for <br /> FAST transit network, particularly along SMART freeway and arterial corridors <br /> 7. Feasibility analyses and high-level design concepts for certain corridors. <br /> 8. Technical Memo with Project List and Prioritization Comparison <br /> 9. Implementation Plan with Cost Estimates and Funding Plan <br /> ii. All documents, including digital files, will become the property of the Department. Any <br /> and all original graphics, technical drawings, photographs, maps, GIS files, and <br /> promotional items produced for the plan or for any public meetings shall be available for <br /> use by the Department in other publications, on the Department website and for display <br /> purposes. The Department shall be credited for its participation in all documents, <br /> publicity, announcements, and materials prepared for/by the County for public meetings. <br /> iii. The County shall receive digital files and hard copies of the approved Study. The County <br /> shall be responsible for the distribution of the final documents to the appropriate local <br /> agencies and interested parties. <br /> B. TIMEFRAMES <br /> It is important that the County provide necessary support and responses to the Department <br /> in a timely manner. Any delays on the part of the County may affect the ability of the <br /> Department to provide financial support for the Project. <br /> IV. COSTS AND FUNDING <br /> A. PROJECT COSTS <br /> The estimated cost of the Project is $855,000. The County shall participate in project costs <br /> up to a maximum of $105,000. The Department is responsible for all costs that exceed <br /> $855,000. If the costs are less than $855,000, the Department will return any overpayment <br /> based on the County's percentage contribution to the total project cost. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.