Browse
Search
Agenda 04-16-24; 8-f - Approval of Orange County Agreement – Freeway, Arterial, Street, and Tactical (FAST) 2.0 Study
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 04-16-2024 Business Meeting
>
Agenda 04-16-24; 8-f - Approval of Orange County Agreement – Freeway, Arterial, Street, and Tactical (FAST) 2.0 Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 10:25:38 AM
Creation date
4/11/2024 10:20:32 AM
Metadata
Fields
Template:
BOCC
Date
4/16/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Agenda for April 16, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 04-16-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> The Consultant will prepare and submit one (1) memorandum summarizing the existing plans that were reviewed, <br /> and will prepare and submit one (1) high-level needs assessment memorandum summarizing the challenges, <br /> opportunities,and gaps in current system. <br /> The Consultant will prepare and submit one(1)high-level project equity plan that will evaluate and recommend how <br /> equity considerations can be incorporated into the priority corridor identification and overall regional network <br /> recommendations. <br /> After identifying the needs that exist in the current system, the Consultant will work to identify primary corridors <br /> within the regional network. As part of that identification process, the Consultant will conduct, up to twenty (20), <br /> one-on-one interviews with study partners'senior leadership,or senior technical staff. Incorporating feedback from <br /> stakeholder one-on-one interviews, along with the needs data analysis and plan review,the Consultant will use the <br /> Delphi technique to identify primary corridors. The Consultant will prepare and submit one (1) high-level <br /> memorandum identifying the regional network and primary corridors. <br /> Task D Deliverables: <br /> • One(1)high-level needs assessment memorandum <br /> o One(1)draft <br /> o One(1)final <br /> • One(1)existing plans memorandum <br /> o One(1)draft <br /> o One(1)final <br /> • One(1)high-level regional network and primary corridor identification memorandum <br /> o One(1)draft <br /> o One(1)final <br /> • One(1)high-level project equity plan <br /> o One(1)draft <br /> o One(1)final <br /> Task E—Project/Improvement Evaluation & Recommendations <br /> The Consultant will evaluate a suite of options which may be appropriate for implementation along primary corridors <br /> and the network overall.This may include: <br /> o Coordination with sponsors of existing plans and projects within the study area <br /> o Mobility Hubs, complete streets, TOD opportunities and micromobility solutions as a part of a robust <br /> regional multimodal transportation network especially in relation to already planned BRT corridors and <br /> proposed GoTriangle site in RTP <br /> o Explore opportunities for improved transit rider experience for existing and expanded Bus On Shoulder <br /> System(BOSS),selected operational or other low-cost improvements that may improve travel for transit <br /> and/or all users <br /> o Dynamic transit priority shoulders adjacent to freeway medians, including potential toll opportunities. <br /> o Express lanes with transit priority <br /> o Direct access ramps for enhanced freeway transit <br /> o Queue jump lanes or RED transit lanes <br /> o Transit facilities on the outside or in the median of arterials with alternative designs like reduced conflict <br /> intersections or median u-turns <br /> o BRT or FAST transit linkage between 1-40 and relocated regional transit center <br /> o On-ramp signals and freeway connector ramp signals for area freeways <br /> o Variable speed limits along area freeways <br /> o Transit signal priority standardization <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.