Browse
Search
Agenda 04-16-24; 8-f - Approval of Orange County Agreement – Freeway, Arterial, Street, and Tactical (FAST) 2.0 Study
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 04-16-2024 Business Meeting
>
Agenda 04-16-24; 8-f - Approval of Orange County Agreement – Freeway, Arterial, Street, and Tactical (FAST) 2.0 Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 10:25:38 AM
Creation date
4/11/2024 10:20:32 AM
Metadata
Fields
Template:
BOCC
Date
4/16/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Agenda for April 16, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 04-16-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br /> In addition to the established project committees,the project process and outcomes are expected to be presented <br /> at up to three (3) milestones to key regional transportation agencies, local governments, and community leaders. <br /> Municipalities, regional agencies, and NCDOT will receive individual implementation plans to facilitate the <br /> appropriate levels of endorsement, support, or adoption.The Consultant will prepare up to three (3) presentations <br /> (one for each milestone)and will participate in up to fifteen (15) presentations. <br /> Governance Framework <br /> The Consultant will work with the Client to develop a governance framework for the project. It will include the <br /> structure, function, and responsibilities of the partner agencies. The most important part of the governance <br /> framework will be defining a quick decision-making process to maintain the tight schedule.An ongoing working group <br /> will be established to monitor,evaluate,and alter, if needed,the implementation of FAST and SMART projects. <br /> Task C Deliverables: <br /> • One(1)Public engagement/outreach plan <br /> o One(1)draft <br /> o One(1)final <br /> • Public engagement materials at up to three(3)milestones <br /> o One(1)draft package of materials for each round <br /> o One(1)final package of materials for each round <br /> • Participation in up to ten(10)pop-up events <br /> • Participation in up to four(4)Steering Committee meetings(agendas, materials and minutes, as needed) <br /> • Participation in up to four(4)technical committee meetings(agendas, materials and minutes, as needed) <br /> • Participation in up to 15 presentations to other/regional stakeholders <br /> • Preparation of up to 3 presentations(one for each milestone)for other/regional stakeholders <br /> o One(1)draft <br /> o One(1)final <br /> • One(1)Governance plan/framework <br /> o One(1)draft <br /> o One(1)final <br /> Task D—Needs Assessment/Analysis& Primary Corridor Identification <br /> In order to identify new (since Phase I FAST Study) transportation challenges, opportunities, and gaps in current <br /> system,the Consultant will: <br /> • Review existing transportation data, planning documents, and relevant policies, including, but not limited <br /> to: <br /> o Phase I FAST Study, NCDOT Complete Streets & Roadway Design Manual, CAMPO BOSS Study, <br /> CAMPO RED lanes study,Wake Transit Plan and updates,City of Raleigh &Town of Chapel Hill BRT <br /> studies, CAMPO BRT studies, Durham BRT studies, Durham Transit Plan and updates, Orange <br /> Transit Plan and updates, Triangle Bikeway Study, Central Pines COG Connected Region, and the <br /> current NCDOT TIP. <br /> • Gather existing quantitative and qualitative data related to transportation infrastructure, existing transit <br /> services, population demographics,traffic patterns,transit services,and land use patterns. <br /> • Review existing/planned projects in the region,with the goal to ensure regional network coordination and <br /> to identify where project investments may be leveraged. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.