Browse
Search
2024-169-E-AMS-Siemens Industry-Increase in costs due to construction delays
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-169-E-AMS-Siemens Industry-Increase in costs due to construction delays
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 1:41:21 PM
Creation date
4/8/2024 1:41:09 PM
Metadata
Fields
Template:
Contract
Date
3/12/2024
Contract Starting Date
3/12/2024
Contract Ending Date
3/25/2024
Contract Document Type
Contract
Amount
$23,791.10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clarifications <br />1.Siemens will be providing parts and smarts to the selected electrical contractor for this project. <br />2.Siemens will provide the fire alarm permit, review and inspection fees. <br />3.Siemens will need to be provided with architectural backgrounds in Auto CAD files, approved fire <br />protection report, and full set of construction documents, free of charge. <br />4.Siemens will provide twelve submittal sets of drawings, as well as two construction sets, and two as <br />built sets.An electronic and hard set of approved and stamped as builds will be provided to the Owner <br />upon the project completion. <br />5.Owner will need to allow Siemens full and complete access to the property for the duration of the <br />project. <br />6.All scheduling and phasing will need to have the Owner's input and will require the Owner's <br />cooperation to complete during the allotted time. <br />7.Submittals may take between 4-6 weeks for approval through the Fire Department. <br />8.All work to be performed during normal working hours of Monday thru Friday, 6:00am to 4:00pm. <br />9.If this proposal includes a Smoke Control/Smoke Management system, Siemens must be provided <br />Smoke Control/Smoke Management Drawings which define all Zone Boundaries, location, type of <br />equipment used, and a detailed input/output matrix or sequence of operations.In the event that such <br />information is provided post-award or such information is discovered by Siemens during installation of <br />the scope, a change order for additional time and an increase in cost may be required due to the <br />information differing from assumptions that Siemens had to make in developing the scope. <br />Page 7 of 11 <br />DocuSign Envelope ID: F1274CE7-87E2-472B-80D7-92EE123F3A5E
The URL can be used to link to this page
Your browser does not support the video tag.