Orange County NC Website
Scope of Work <br />Extra labor hours needed to cover delays in construction. <br />Exclusions and Clarifications <br />No materials involved. <br />Work to be performed during regular working hours. <br />Inclusions <br />1.Engineering <br />2.Project Management for Siemens Scope of work <br />3.System Commissioning and Final Pretest <br />4.Final AHJ Testing and certification <br />5.Fire Alarm Submittal to customer <br />6.Fire Alarm Submittal to AHJ <br />7.Fire Alarm Permit or Electrical Permit or costs associated with this project <br />8.Professional Engineers stamp which may be required <br />9.Supply or installation of any electrical conduits, cables, wiring or back boxes, and equipment <br />10.As interpreted in the specifications, as shown on drawings, and as defined in this proposal <br />11.Price is based on Auto-CAD electronic drawings for the project being supplied to us by others <br />12.DACT <br />13.One (1) year warranty <br />14.Final wiring terminations to the control panel <br />15.Three (3) submittals <br />16.Three (3) O&M manuals <br />17.Programming <br />Page 5 of 11 <br />DocuSign Envelope ID: F1274CE7-87E2-472B-80D7-92EE123F3A5E