Browse
Search
2024-166-E-AMS-Sasser Restoration-Remediation of Crisis Diversion Center at Orange County Sheriff's Office
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-166-E-AMS-Sasser Restoration-Remediation of Crisis Diversion Center at Orange County Sheriff's Office
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 1:39:35 PM
Creation date
4/8/2024 1:39:24 PM
Metadata
Fields
Template:
Contract
Date
3/18/2024
Contract Starting Date
3/18/2024
Contract Ending Date
3/25/2024
Contract Document Type
Contract
Amount
$25,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Phone: (336)449-1144 PO Box 10, Whitsett, NC 27377 Fax: (336)449-1151 <br /> www.SASSERCOMPANIES.com <br />16 March 2024 <br /> <br />Mr. Paul Sorrell <br />Orange County Sheriffs Department <br />106 E Margaret Lane <br />Hillsborough, NC. 27278 <br /> <br /> <br />Sasser Restoration was requested to inspect the Orange County Sheriff’s Department with <br />special attention to the Crisis Center, located at 106 E Margaret Lane Hillsborough, NC. Sasser <br />Restoration was asked to come in to perform under emergency services the setting of HEPA <br />equipped air scrubbing, containments and the remediation and moving of two (2) file cabinets. <br />For the necessary remediation within the Crisis Center, Sasser Restoration is proposing the <br />following: <br />Recommended Work: (Not necessarily in the listed order) <br />Pilates Studio: <br />• Placement of HEPA equipped negative air machines/scrubbers within the crisis center <br />under neutral pressure until remediation begins in which then will be transferred to <br />negative pressure. <br />• HVAC duct cleaning and sealing off of vent registers post duct cleaning for testing. <br />• Removal of the affected roughly 16 sf of glued down carpet in the room with the leaking <br />conduit. <br />• HEPA vacuum all remaining carpeting and steam clean. Upon dry, the carpeting will be <br />covered with carpet mask to seal out. <br />• HEPA sandwich all contents within the crisis center area. <br />• HEPA sandwich all ceilings, walls and floors of the Pilates Studio. HEPA sandwiched is <br />the preferred method as outlined in the IICRC’s S520 (mold standard). The HEPA <br />sandwich consists of a heavy HEPA vacuuming of the surfaces for the gross spore and <br />contaminate removal, damp wiping and or wet washing all surfaces for the cleaning and <br />treating, followed up by a light HEPA vacuuming for the final particulate removal to <br />have the surfaces prepared for the testing performed by the Environmental Solutions <br />Group from Greensboro. <br />• Seal out all potential locations for air intrusions/outside environment breathing in with 6- <br />mil poly (windows, doors, registers, holes in floors, etc). <br />• Decontamination/entry/dress out chamber will be constructed. This is required by the <br />IICRC’s S520 (mold standard) as a critical barrier as well as the required dress out area <br />for the industrial hygienist conducting the post remediation verification or testing). Non- <br />invasive chamber. <br />DocuSign Envelope ID: EEC55B49-026B-471A-A0BF-9AA1D35664C6
The URL can be used to link to this page
Your browser does not support the video tag.