Browse
Search
2024-158-E-Emergency Svc-Honeywell International-Hardware, software, installation, training, testing, technical support
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-158-E-Emergency Svc-Honeywell International-Hardware, software, installation, training, testing, technical support
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 1:28:17 PM
Creation date
4/8/2024 1:27:33 PM
Metadata
Fields
Template:
Contract
Date
3/11/2024
Contract Starting Date
3/11/2024
Contract Ending Date
3/21/2024
Contract Document Type
Contract
Amount
$115,030.03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPRIETARY and CONFIDENTIAL PRIMARY DISPATCH SYSTEM Page 5 of 18 <br />Item Unit Mfr Qty Description Part No.US List Unit QUOTE UNIT QUOTE EXT <br />DM1 YR USDD 1 <br />G2 FSA Mapping Server - Yearly <br />Hosting Cost (Cloud/USDD Hosted) <br />Using National Street Data we <br />provide, as-is <br />MAP-CLD $ 1,540.00 $ 1,386.00 <br /> 1386 included at <br />no charge/no <br />additional cost <br />Item Unit Mfr Qty Description Part No.US List Unit QUOTE UNIT QUOTE EXT <br />DM2 EA USDD 0 <br />G2 FSA Mapping Server (Hardware <br />for mapping interface) 1@2RU <br />ONLY NEED TO INCLUDE IF YOU <br />DO NOT WISH USDD TO HOST. <br />Would contain only your data / <br />Accessible only to your system. <br />MAP-CUS $ 5,215.00 $ 4,693.50 - <br />Item Unit Mfr Qty Description Part No.US List Unit QUOTE UNIT QUOTE EXT <br />DM3 HR USDD 0 System Configuration and <br />Modification for Mapping MAP-CM $ 325.00 $ 292.50 - <br />DM4 LOT USDD 0 Customer-Hosted Mapping Server <br />Configuration and Start-up MAP-CSU-O $ 5,925.00 $ 5,332.50 - <br />DM5 LOT USDD 0 Mapping Gateway Project <br />Management MAP-PM $ 415.00 $ 373.50 - <br />DM6a LOT USDD 0 Training - Mapping Service - On- <br />Site (4 Hours)MAP-TRN-O $ 4,425.00 $ 3,982.50 - <br />DM6b LOT USDD 0 Training - Mapping Services - At <br />Arizona Training Center MAP-TRN-AZ $ 1,550.00 $ 1,395.00 - <br />DM6c LOT USDD 0 Training - Mapping Services - <br />Remote Refresh (4 Hours)MAP-TRN-R $ 1,325.00 $ 1,192.50 - <br />DM7 LOT USDD 0 Misc Option 1 $ - $ - - <br />- <br />- <br />- <br />Shipping Total: <br />System Subtotal <br />PRIMARY DISPATCH MAPPING SERVICE System Total: <br />Mapping System costs typically only need to be assumed once per dispatching agency, no matter how many stations are <br />dispatched (unless redundant centers or further modifications are needed). Costs for this part of the system are often shared <br />between consolidated agencies. <br />USDD-HOSTED MAPPING - INCLUDED (at no additional cost while under Warranty/Support) <br />CUSTOMER-HOSTED MAPPING <br />MAPPING SYSTEM SERVICES <br />PRIMARY DISPATCH MAPPING SERVICE <br />DocuSign Envelope ID: 7E694176-9E31-49DB-A1E4-AFB129905EB1
The URL can be used to link to this page
Your browser does not support the video tag.