Browse
Search
2024-155-E-AMS- S&W Home Services-Sportsplex - Pool Concrete Lift
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-155-E-AMS- S&W Home Services-Sportsplex - Pool Concrete Lift
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 1:25:34 PM
Creation date
4/8/2024 1:25:17 PM
Metadata
Fields
Template:
Contract
Date
3/14/2024
Contract Starting Date
3/14/2024
Contract Ending Date
3/20/2024
Contract Document Type
Contract
Amount
$5,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECIPIENT: <br />Andrew Stock <br />101 Meadowlands Drive <br />Hillsborough, NC 27278 <br />Estimate #3768 <br />Sent on Feb 14, 2024 <br />Inspector Chris Varon <br />CompanyCa <br />m Project <br />https://app.companycam.com/pr <br />ojects/59790335 <br />Total $5,000.00 <br />Product/Service Description Qty.Total <br />Concrete Lifting Area of Work: Pool Deck <br />This line item represents lifting along the front side of the pool <br />deck. Starting at the life guard stand and continuing down to the <br />corner at the pool steps. <br />There is a risk that lifting the concrete will damage the channel <br />drain and that it would need to be repaired. The reason is because <br />that channel drain is connected to the concrete and as the <br />concrete has settled it has pulled the drain down with it causing <br />the current slope. This is not something that TCS would be <br />responsible for repairing. <br />We will attempt to lift and stabilize your concrete by injecting <br />polyurethane foam beneath the affected area. The goal for this <br />area is to return your concrete to its original position and prevent <br />future settlement. <br />100 $5,000.00* <br />A deposit of $500.00 will be required to schedule your work. <br />* Non-taxable <br />1. While uncommon, TCS cannot guarantee maximum anticipated lift, only <br />stabilization of the treated slab(s). <br />2. Customer understands that the solution is designed for settled slabs, not tree <br />root damage, heave, or creep. <br />3. Customer bears the sole responsibility to disclose any underground materials <br />that could affect the work, including, but not limited to, plumbing, electrical, rebar, <br />and drainage. <br />4. While TCS exercises an abundance of caution, it is possible that slabs can <br />crack during the lifting process. If a slab cracks during the lifting process, TCS will <br />properly seal the resulting crack at no charge to the Client. The customer is aware <br />of this possibility and releases TCS from any and all responsibility with regard to <br />Total $5,000.00 <br />1 of 2 pages <br />14012 Bingham Drive | Raleigh, North Carolina 27614 <br />(919) 322-9459 | quotes@triangleconcretesolutions.com | triangleconcretesolutions.com <br />DocuSign Envelope ID: DFB159D1-46F3-4892-B009-E6A072C3FD1A
The URL can be used to link to this page
Your browser does not support the video tag.