Browse
Search
Agenda - 04-13-2004-10b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 04-13-2004
>
Agenda - 04-13-2004-10b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:45:03 PM
Creation date
8/29/2008 10:40:06 AM
Metadata
Fields
Template:
BOCC
Date
4/13/2004
Document Type
Agenda
Agenda Item
10b
Document Relationships
Minutes - 20040413
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Design and se]ect materials that generate less noise and those that dampen noise during the ~~ <br />construction process <br />• Reduce noise generating equipment so that the maximum decibel reading level at the property line <br />is SOdb <br />• Meet all local noise ordinances <br />Conunissioninh <br />A. Training <br />• Provide training to all employees about the systems that exits, these include the following: <br />• HVAC systems <br />• Lighting systems <br />• Plumbing and water conservation systems <br />• C02, temperature, and other monitoring systems <br />• Passive or active solar, geo-thermal or bio mass systems <br />• Irrigation systems <br />• Control and management systems <br />B. Review <br />• Provide all stakeholders with review opportunities before occupancy of the building <br />• Provide all stakeholders with an opportunity to review the building after one year of occupancy <br />• Provide data concerning temperature, humidity and energy consumption to all stakeholders after <br />month, 6 months, l2 months and 24 months <br />• Require all stakeholders to use HPS features as designed or to report problems immediately to <br />responsible authorities, <br />Each architect and contractor employed by the Board of Education shall provide the Board with written <br />documentation verifying their compliance with the guidelines presented both during the planning and <br />construction phase of the building. Architects and contractors will provide at the bidding phase their <br />experience related to high performance school standards. If; due to the issue of excessive costs or site <br />issues, a guideline cannot be met, the architect or contractor must submit written justification to the <br />Superintendent or designee as well as any alternative plans to reach the desired outcome. Architects and <br />contractors are also required to meet the requirements of Policy 9010- Site Selection and Policy 9O?0- <br />Facility Design. <br />Chapel Hill-Carrboro City Schools <br />http://nt5..scbbs.com/cgi-bin/om_isapi.dll?clientID=546502&depth=2&infobase=chaphill.n._. 8/11 /2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.