Browse
Search
Agenda - 04-13-2004-10b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 04-13-2004
>
Agenda - 04-13-2004-10b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:45:03 PM
Creation date
8/29/2008 10:40:06 AM
Metadata
Fields
Template:
BOCC
Date
4/13/2004
Document Type
Agenda
Agenda Item
10b
Document Relationships
Minutes - 20040413
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I)12AFT ~ y <br />3. Building Standards, The building design shall stress <br />compact design features including multi-story construction, The <br />physical education and athletic facilities shall be designed to <br />minimize land disturbance; <br />4. Water Use Standards, Design standards shall have a <br />goal of aggregate water reduction of 20% of the base, not <br />including irrigation, after meeting EPA 1992 fixture performance <br />requirements with respect to irrigation and reflect xeriscaping <br />principles; <br />5. Shared Use Standards. Design standards shall provide <br />the public with non-school hour access to exterior spaces, <br />including a vita track, cross country course designed and <br />maintained to increase environmental awareness and interior <br />spaces for community use including common areas, auditoria and <br />meeting rooms; and <br />6. CHCCS High Performance Standards. Design standards <br />shall comply with the high performance building design criteria <br />in School Board Policy 9040 (see attached). <br />7. Transportation Enhancement Standards. Commit at least <br />$300,000 of the $2,200,000 additional appropriation to the <br />following capital purchases as part of a smart growth plan to <br />reduce dependency on the automobile for school functions and to <br />reduce vehicle miles traveled related to school functions: <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.