Browse
Search
4-3-24 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2024
>
4-3-24 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:53:29 PM
Creation date
4/3/2024 4:46:03 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4_3_24 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
74 <br /> It may be possible to increase each 4-bedroom lot to a 5-bedroom, but this will require a <br /> drainfield layout. A drainfield layout will also be required on every lot in order to determine the <br /> drainfield specifications; trench width, trench depth, LTAR, drainfield type (Accepted, Low- <br /> Profile Chamber, Panel block, etc.), etc. <br /> In order to perform the drainfield layout, the following items will be required: <br /> • The property lines and corners will be flagged in the field by a surveyor. <br /> • The house box will be clearly staked on each lot. <br /> • Any additional site improvements, such as a pool, should be staked. <br /> CONCLUSIONS <br /> The findings presented herein represent our professional opinion based on our Septic Suitability <br /> Evaluation and knowledge of the current laws and rules governing on-site wastewater systems in <br /> Orange County and North Carolina. There is ample soil to accommodate at minimum a 4- or 5- <br /> bedroom house on each of the 15 lots. <br /> Soils naturally change across a landscape and contain many inclusions. As such, attempts to <br /> quantify them are not always precise and exact. Due to this inherent variability of soils and the <br /> subjectivity when determining limiting factors, there is no guarantee that a regulating authority <br /> will agree with the findings of this report. Any concurrence with the findings of this report will <br /> be made by regulating authority at the time of Improvement Permit issuance. <br /> Lawrence Road Septic Suitability Report December 11, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.