Browse
Search
4-3-24 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2024
>
4-3-24 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:53:29 PM
Creation date
4/3/2024 4:46:03 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4_3_24 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35 <br /> Proposed Access and Transportation Network Improvements <br /> The project proposes residential access via a new 50-foot public right of way connecting Miller Road, and <br /> is subject to NCDOT design and construction standards. No roadway improvements are required by <br /> NCDOT, but the project will require a Driveway Permit. The new road shall not be interconnected to any <br /> adjacent properties and is proposed to terminate in a cul-de-sac conforming with the NC State Fire Code. <br /> Per LIDO Section 6.17.2(2), a traffic impact analysis is not required. <br /> Summary of Transportation Information <br /> Existing Roadway Characteristics <br /> Affected Roadway Miller Road <br /> Type of Roadway Local — 2 lane undivided <br /> Current Roadway Capacity 10,000 AADT <br /> Latest Traffic Volume 1,600 AADT <br /> Traffic Generation <br /> Number of Trips Expected to be Generated by 150 <br /> Proposed Project <br /> Proposed Utilities <br /> Water and wastewater services will be provided via individual private wells and septic systems on each lot. <br /> Wells and septic systems shall meet Orange County Environmental Health standards. <br /> Erosion Control/Stormwater Regulations <br /> The applicant has indicated the project will conform to existing stormwater management (Section 6.14) and <br /> erosion and sedimentation control (Section 6.15) regulations of the UDO. <br /> Land Use Buffers/Setbacks <br /> North 30' from front, 15' from side and rear Setback <br /> South 30' from front, 15' from side and rear Setback <br /> East 30' from front, 15' from side and rear Setback <br /> West 30' from front, 15' from side and rear Setback, 30' Type B Buffer <br /> Reduced setbacks are permitted as part of the Flexible Development Option. <br /> Environmental Assessment (EA) <br /> An Environmental Assessment is not required for concept plan applications. <br /> Solid Waste <br /> The applicant has indicated development within the project will conform to the Orange County Solid Waste <br /> Management Ordinance. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.