Browse
Search
April 3 2024 ORC Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2024
>
April 3 2024 ORC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:45:38 PM
Creation date
4/3/2024 4:41:45 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2024
Document Type
Agenda
Document Relationships
4_3_24 ORC Meeting Summary
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Ordinance Review Committee\Minutes\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
43 <br /> (C) The landscape and tree preservation plan must include the following: <br /> (1) The location of existing and proposed structures, parking areas, roadways, <br /> fences and walls. Landscape and tree preservation plans for subdivisions shall <br /> not be required to show proposed structures, parking areas, fences or walls on <br /> individual lots. <br /> (2) The location of any required landscape buffers, trees, shrubs and screening <br /> materials to be planted; <br /> (3) A legend listing all plant materials to be planted; <br /> (4) The location of any lighting fixtures proposed to minimize conflicts between <br /> lighting and landscaping; <br /> (5) The location and species of existing trees in buffer areas if seeking credits for <br /> existing vegetation in accordance with Section 6.8.8; <br /> (6) Primary tree protection areas, the critical root zones, and the method of <br /> protection; <br /> (7) Storage areas for construction vehicles and materials, including stockpiled soil <br /> and gravel; <br /> (8) How areas disturbed during construction are to be restored. Such efforts should <br /> be phased to coincide with the establishment of final grades to minimize erosion; <br /> and <br /> (9) Planting details in accordance with Section 6.8.5(D). <br /> (D) Where needed for clarity, the landscape and tree preservation plan can be provided on <br /> separate sheets divided intp MG sheets: a tree preservation plan and a planting plan. <br /> (E) Following approval and prior to the start of construction, the plan shall be posted on the <br /> job site and reviewed with all contractors. <br /> 6.8.11 Request for Extension of Compliance <br /> It is recognized that land development occurs GORtORYOUSly continuously and that vegetation <br /> used in landscaping or screening should be planted during specific times of year and in the <br /> construction timeline to ensure the best chance of survival. In order to ensure compliance and to <br /> reduce the failure of landscaping or screening materials`"'high were installed at an inappropriate <br /> time or under unfavorable conditions the applicant may request an extension of landscaping <br /> compliance in accordance with the following: <br /> (A) A Letter of Request for Extension of Compliance (LREC)with landscaping requirements <br /> may be filed with the Planning Director, or designee, which states the reasons why the <br /> request is being made. <br /> (B) The applicant shall state in the LREC that they are aware of all landscaping and <br /> screening requirements, and that the property will be brought into compliance within 90 <br /> days of the approval of the extension, or discontinue use of the property. <br /> (C) <br /> omitted between May 15 and September 15 of each year, Rd m ant+he <br /> extensions at other times if there a lunfAvArAhle GE)Rditiens fer planting. <br /> (D) If the initial LREC has expired and conditions are still deemed unsuitable for planting, an <br /> applicant may request one additional extension of up to 90 days. During periods of <br /> extreme drought, as evidenced by the official declaration of Stage 3 or greater mandatory <br /> water conservation requirements, the Planning Director, or designee, may authorize <br /> additional 90-day extensions beyond the one extension typically allowed. These <br /> extensions may be continued throughout the period in which the extreme drought <br /> conditions remain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.