Browse
Search
April 3 2024 ORC Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2024
>
April 3 2024 ORC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:45:38 PM
Creation date
4/3/2024 4:41:45 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2024
Document Type
Agenda
Document Relationships
4_3_24 ORC Meeting Summary
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Ordinance Review Committee\Minutes\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br /> (1) The buffer width adjacent to streams shall be calculated for both Method A and <br /> Method B, and at any given point along the stream, the width of the buffer shall <br /> be the larger of the two. <br /> (2) The same method shall be used to calculate the buffer around the reservoir itself. <br /> New structures shall be located at least 150'from the reservoir or outside of the <br /> stream buffer, whichever is greater. <br /> (B) University Lake Protected Watershed (UNIV-PW) <br /> (1) The buffer width shall be calculated for both Method A and Method B, and at any <br /> given point along the stream, the width of the buffer shall be the larger of the two. <br /> (C) Cane Creek Critical Area (CANE-CA) & Upper Eno Critical Area (U-ENO-CA) <br /> (1) The buffer width adjacent to streams shall be the width calculated using Method <br /> A. <br /> (2) Method A shall also be used to calculate the buffer around the reservoir itself. <br /> New structures shall be located at least 150'from the reservoir or outside of the <br /> stream buffer, whichever is greater. <br /> (D) Upper Eno Protected (U-ENO-PW), Lower Eno Protected (L-ENO-PW) & Back Creek <br /> Protected (BACK-PW) <br /> (1) The buffer width shall be as calculated using Method A, or 150', whichever is <br /> less, except where density exceeds 1 du/ac and impervious surface exceeds <br /> 12%. <br /> (2) Where density exceeds 1 du/ac and impervious surface exceeds 12%, the buffer <br /> width shall be calculated as above, but shall not be less than 100'. <br /> (E) Cane Creek Protected (CANE-PW), Little River Protected (LITTLE-PW), South Hyco <br /> Creek Protected (HYCO-PW), Flat River Protected (FLAT-PW), Haw River Protected <br /> (HAW-PW) &Jordan Lake Protected (JORDAN-PW) <br /> (1) The buffer width shall be the width calculated using Method A, or 150', whichever <br /> is less. <br /> 6.13.5 Areas Outside of Watershed Protection Overlay Districts <br /> (A) In areas not identified on the Official Zoning Atlas as Watershed Protection Overlay <br /> Districts, a stream buffer a minimum of 50 foot in width shall be established along both <br /> sides of streams identified n r confirm 6.13.2. <br /> (B) Stream buffers for coil Survey streams shall only be calculated using Method A as <br /> explained in Section 6.13.3. <br /> 6.13.6 Uses Allowable Within Stream Buffers <br /> (A) General Standards <br /> (1) Prior to any Land-Disturbing Activity within a designated stream buffer, the <br /> property owner shall provide written notification of the location and nature of the <br /> proposed use to the Planning Department for review. The notification shall state <br /> that the use shall be designed, constructed, and maintained to minimize soil <br /> disturbance and to provide the maximum water quality protection practicable. <br /> (2) All Land-Disturbing Activities within a designated stream buffer require approval <br /> of the Erosion Control Officer in accordance with applicable State and local <br /> regulations, as well as all other required local, State and/or Federal permits and <br /> approvals prior to commencement of Land Disturbing Activities. <br /> (3) The submittal of additional information and/or applications may be required prior <br /> to any Land Disturbing Activity within a designated stream buffer, in accordance <br /> with the provisions of this Ordinance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.