Browse
Search
Agenda 04-02-24; 8-j - Orange County FY 2025 Annual Work Program
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 04-02-2024 Business Meeting
>
Agenda 04-02-24; 8-j - Orange County FY 2025 Annual Work Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 2:39:39 PM
Creation date
3/28/2024 2:35:10 PM
Metadata
Fields
Template:
BOCC
Date
4/2/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-j
Document Relationships
Agenda for April 2, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 04-02-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County FY25 Annual Work Program 60 <br /> Capital <br /> REQUEST# Project Name Requesting Agency <br /> 18TOCCD5 Carrboro <br /> South Greensboro Street Sidewalk <br /> Estimated Start Date Estimated Completion Estimated Capital Cost <br /> FY20 FY25 FY2023(Current) $ 478,921 <br /> $ - <br /> Project Description/Scope Enter below a summary of the project that may later be used as the project <br /> The design and installation of a sidewalk along one side on South Greensboro Street(TIP#C-5650)from the north end of Old <br /> Pittsboro Road to Public Works Drive,appropriately 0.9 miles. In addition to establishing a continuous pedestrian facility along the <br /> major north-south axis to Carrboro,the improvement would provide pedestrian access to bus stops for 8 Chapel Hill Transit routes <br /> and one GoTriangle Route within the 1/2 mile(the walking service area). The project connects the recently completed improvements <br /> to Smith Level Road (U-2803) and the future Morgan Creek Greenway(EL-4828)to downtown Carrboro. <br /> Please detail project justification <br /> Phase Fiscal Quarter and Fiscal Year Fiscal Quarter and <br /> Planning <br /> Design <br /> Construction <br /> Equipment <br /> Land-Right of Way <br /> Other <br /> Project Goal <br /> Implementation Matrics <br /> 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.