Orange County NC Website
42 <br /> Robert Williams said there were discussions and SWAG raised their hand in support of 3 <br /> if some of the new fees were offset with new revenues. <br /> Commissioner Fowler said it becomes more expensive as you move through the <br /> scenarios. <br /> Slide #23 <br /> Key Impacts of Road to Zero taste Scenarios <br /> SINGLE,STREAM <br /> RECYCLING <br /> ®®®Road to Zero Waste <br /> Ian includes impacts <br /> ®®® <br /> on diversion tonnages <br /> as described <br /> les to the right. <br /> k tab Ad dithin al Tonnage:Curnulait�ve <br /> 1 # : <br /> l <br /> Note:Financial impacts are <br /> modeled at2596 <br /> for residential only. <br /> Net-rip - 111 YIY Y 1 <br /> Slide #24 <br /> SCENARIORECOMMENDATION <br /> Eubanks Road DiSpoSal Facility <br /> Possible Concept for the Future <br /> Need to improve the Material Recovery Facility <br /> now located at Eubanks Road. <br /> 1 Anew covered facility to address transfer/ 4 <br /> processing of 55R and incorporate other material <br /> streams that are nuwseparatedin the iocatian. <br /> 1 5taffing efficiencies could be gained by co-located <br /> material recovery operatic%to a single locatloa '~+ <br /> 1 Master plan needed to look at relocating <br /> maintenance facility and yard to make room for <br /> expanded processing capability. <br /> Reflecting adjacent€ommurrr'ty concerns <br /> an alternate site should also be considered. ....::.... ........ : <br /> I' <br />