Orange County NC Website
US 70 Multimodal Corridor Study <br /> Table 1 US 70 Corridor Plan Goals <br /> Goal 1: Manage increasing vehicular traffic congestion, including auto, EMS, and <br /> Afreight. <br /> A <br /> (k Goal 2: Prioritize bicycle and pedestrian connectivity through the corridor. <br /> Mobility Goal 3: Improve transit accessibility. <br /> JGoal 4: Guide transportation investment to protect community character. <br /> y <br /> ;VD <br /> Goal 5: Prioritize pedestrian, bicycle, and transit connectivity within urban areas. <br /> Placemaking <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> Goal 7:Work towards Vision Zero. <br /> Safety Goal 8: Reduce pedestrian-automobile conflicts. <br /> Goal 9: Improve multimodal access tojobs within the corridor. <br /> 1 <br /> Goal 10: Improve multimodal access to jobs outside the corridor. <br /> Job Access <br /> Goal 11: Improve multimodal access to parks throughout the corridor. <br /> I <br /> Natural Goal 12: Reduce wildlife-automobile conflicts. <br /> Environment <br /> 13 Goal-Setting <br />