Browse
Search
03.18.2024 Outboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
03.18.2024 Outboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:54:56 AM
Creation date
3/14/2024 11:43:13 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US 70 Multimodal Corridor Study <br /> Table26 Segment F Objectives........................................................................................................................94 <br /> Table 27 NCDOT Complete Streets Policy(2019) Cost Share Scenarios........................................127 <br /> Table 28 Complete Streets Betterment Cost Share.................................................................................127 <br /> List of Figures <br /> Figure No. Description Page <br /> Figure 1 US 70 Study Corridor, Segmented.....................................................................................................3 <br /> Figure 2 Snapshot from the Round 1 Interactive Public Input Map....................................................10 <br /> Figure 3 Snapshot from the Round 2 Interactive Public Input Map....................................................11 <br /> Figure 4 Protected Areas and Open Space....................................................................................................16 <br /> Figure 5 Wildlife Resources in Corridor...........................................................................................................18 <br /> Figure 6 Major Wildlife Corridors &Critical US 70 Crossing Areas......................................................20 <br /> Figure7 Places of Interest....................................................................................................................................23 <br /> Figure 8 Project Vicinity and Study Intersections........................................................................................30 <br /> Figure 9 Historic Traffic Volume Trends by Study Segment...................................................................32 <br /> Figure 10 2019 Seed Data and Statutory Limits.............................................................................................35 <br /> Figure 11 2019 StreetLight Total Truck Percentages....................................................................................37 <br /> Figure 12 Level of Service Illustration.................................................................................................................38 <br /> Figure 13 Corridor Level of Service Summary for US 70.............................................................................39 <br /> Figure 14 Worst Case Intersection Level of Service Summary for US 70.............................................40 <br /> Figure 15 2020-2029 NCDOT STIP Projects in Corridor..............................................................................44 <br /> Figure 16 Bicycle and Pedestrian Accommodations...................................................................................50 <br /> Figure 17 Transit Route in Corridor.....................................................................................................................57 <br /> Figure18 GoTriangle Route Map.........................................................................................................................58 <br /> Figure 19 Run-Off Road Crash Severity& Passing Zones..........................................................................65 <br /> Figure 20 US 70 Recommended Roadway Infrastructure Improvements............................................96 <br /> Figure 21 US 70 Recommended Traffic Operational Improvements.....................................................98 <br /> Figure22 Speed Limit Changes.........................................................................................................................101 <br /> Figure 23 US 70 Bike/Ped Improvements, Segment A..............................................................................104 <br /> Figure 24 US 70 Bike/Ped Improvements, Segment B.............................................................................105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.