Browse
Search
03.18.2024 Outboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
03.18.2024 Outboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:54:56 AM
Creation date
3/14/2024 11:43:13 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DURHAM PROJECT LIST <br /> 5-YEAR PROGRAM <br /> FEBRUARY 2024 <br /> Project ID Description R/W Acq. Let Date Project Manager Name ROW$ UTIL$ CON $ COMMENTS <br /> Begins <br /> U-6021 SR 1118 (FAYETTEVILLE ROAD),FROM WOODCROFT PARKWAY TO BARBEE 10/15/2032 1/1/2040 BETH A. QUINN $4,158,000 $379,000 $15,200,000 Project is funded for engineering only in 2024 STIP and <br /> ROAD IN DURHAM. WIDEN TO 4-LANE DIVIDED FACILITY WITH BICYCLE/ remains suspended. <br /> PEDESTRIAN ACCOMMODATIONS. <br /> U-5516 AT US 501 (ROXBORO ROAD)TO SR 1448 (LATTA ROAD)/SR 1639(INFINITY 10/18/2028 10/15/2030 JOHN W. BRAXTON JR $9,290,500 $2,075,000 $12,400,000 Project is funded for engineering only in 2024 STIP and <br /> ROAD) INTERSECTION IN DURHAM. INTERSECTION IMPROVEMENTS. remains suspended. <br /> BP5-R117 BRIDGE 110 OVER LITTLE CREEK ON SR 1110(FARRINGTON ROAD) 8/14/2030 LISA B. GILCHRIST, El $150,000 $3,709,612 <br /> BP5-R142 PIPE TO BRIDGE ON (SR 1800) HEREFORD ROAD 7/11/2029 LISA B. GILCHRIST, El $75,000 $1,500,000 <br /> I-6000 1-540- DURHAM/WAKE COUNTIES FROM I-40 IN DURHAM TO US 1 INRALEIGH. 11/21/2028 STEPHEN REID DAVIDSON $7,610,000 <br /> BRIDGE PRESERVATION/REHABILITATION. COORDINATE WITH 1-5998& I-5999. <br /> U-5717 US 15/US 501 DURHAM CHAPEL-HILL BOULEVARD AND SR 1116 (GARRETT 4/23/2019 10/20/2026 JOHN W. BRAXTON JR $20,413,786 $53,300,000 ROW acquisition ongoing. <br /> ROAD)CONVERTING THE AT-GRADE INTERSECTION TO AN INTERCHANGE <br /> 80105 Riddle Road Widening Expansion of The Building Center- Econ Dev 3/25/2026 STEPHEN REID DAVIDSON <br /> SM-6105H SM-6105H- Durham- NC 54(Miami Boulevard)at SR 1978(Hopson Road). 3/3/2025 3/11/2026 STEPHEN REID DAVIDSON <br /> Construct a southbound right turn lane on NC 54. <br /> HS-2005N NC 98 AT SR 1919(LYNN ROAD). TURN LANE CONSTRUCTION. 2/19/2025 2/25/2026 MARK S. GALLO $500,000 $1,785,000 Planning and engineering activities underway. <br /> I-5995 1-40-DURHAM/WAKE COUNTIES FROM EAST OF NC 147 TO SR 1728 (WADE 1/20/2026 STEPHEN REID DAVIDSON $53,500,000 Estimate updated in February. <br /> AVENUE). PAVEMENT REHABILITATION. INCLUDE I-5996. <br /> I-5998 1-540- DURHAM/WAKE COUNTIES FROM 1-40 IN DURHAM TO US 70 IN 12/16/2025 STEPHEN REID DAVIDSON $24,500,000 Estimate updated in February. <br /> RALEIGH. PAVEMENT REHABILITATION. COORDINATE WITH I-5999&1-6000. <br /> HS-2405M US 501 BUS. (ROXBORO ROAD)AT MAYNARD AVENUE. INSTALL TRAFFIC 4/25/2025 9/24/2025 KAYLA NOELLE GALES $25,000 $177,000 <br /> SIGNAL WITH PEDESTRIAN ACCOMMODATIONS AND CONNECT TO THE <br /> DURHAM SIGNAL SYSTEM. <br /> SM-6105G SM-6105G- Durham- NC 147 southbound off ramp at SR 1321 (Hillandale Road/ 2/26/2025 STEPHEN REID DAVIDSON Planning and engineering activities underway. <br /> Fulton Street). Widen the NC 147 southbound off ramp to dual right and revise the <br /> traffic signal. <br /> HS-2005S NC 98 NC 98 AT SR 1815(MINERAL SPRINGS ROAD). CONSTRUCT RIGHT 1/29/2024 2/12/2025 STEPHEN REID DAVIDSON $700,000 65% plans. Engineering continuing. <br /> TURN LANES AND SIDEWALK. <br /> HE-0007B SR 1794 (TEKNIKA PARKWAY), FROM SR 1632 (RED MILL ROAD) CONSTRUCT 2/23/2024 1/22/2025 MARK S. GALLO $95,000 $815,000 Funding is insufficient for a roundabout. Project team will <br /> TURN LANES AND SIGNALIZE INTERSECTION. evaluate costs for turn lane. <br /> HS-24051 SR 1110 (BARBEE CHAPEL ROAD)AT DOWNING CREEK 4/19/2024 10/23/2024 KAYLA NOELLE GALES $2,000 $2,000 $120,000 <br /> PARKWAY/HALESWOOD ROAD. INSTALL TRAFFIC SIGNAL WITH PEDESTRIAN <br /> ACCOMMODATIONS. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.